Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
civil construction code civilized construction construction dust digital control construction star rating technology evolution analysis compared water conservancy engineering introduction analysis sample preparation quality requirements htl quad free food product
DL/T 5798-2019 in English

DL/T 5798-2019 in English

VALID

Civil construction code of hydropower and water conservancy engineering

  • Issued on:2019-11-04
  • Implemented on:2020-05-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $550.00
$534.00
Standard No: DL/T 5798-2019
Document status: VALID
Title in English: Civil construction code of hydropower and water conservancy engineering
Title in Chinese: 水电水利工程现场文明施工规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2019-11-04
Implemented on: 2020-05-01
Professional Classification: DL-Electricity
Related Keywords: civil construction code
civilized construction
construction dust digital control
construction star rating technology evolution analysis compared
water conservancy engineering introduction analysis
Related Topics: water conservancy
electric water
Now also the Ministry of Water Resources
civilization
Water conservancy project
hydropower
Hydropower and water conservancy
General safety technical regulations for construction of water conservancy and hydropower projects
Construction survey of hydropower and water conservancy underground engineering
Civilization Construction
Construction site water supply
Water conservancy and hydropower engineering construction survey specification SL 52-2015
plumber
Water conservancy and hydropower engineering construction organization manual
Civilized Construction Specifications
Water conservancy project lime
Water conservancy and hydropower protection engineering construction
Fire protection in water conservancy and hydropower projects
The latest version of "Construction Specifications for Water Conservancy and Hydropower Protection Engineering"
Use of gas cylinders at construction sites
Water conservancy and hydropower project construction site manager occupation
Construction of geomembrane panel dam in hydropower and water conservancy projects
Water conservancy and hydropower project formwork construction
dl/t2011-2019
dl/t1966-2019
Energy dissipation in water conservancy and hydropower projects
dl/t5784-2019
dl/t5787-2019
dl/t 5786-2019
dl/t 799 -2019
dl/t 5796-2019
Construction of riprap bank protection for water conservancy and hydropower projects


Introduction

Analysis of the core content of the standard

Technical field Requirements of the old version Innovations of the 2019 version
On-site roads Basic traffic functions Smart traffic management + ecological drainage system
Concrete production Conventional dust removal Fully enclosed mixing + wastewater recycling
Metal processing Basic safety protection Explosion-proof lighting + VOC recovery device

Key Technical Requirements

1. On-site Road Management

The specification requires that the hardening rate of the main roads on the site be 100%, and that a super-high slope of 2%-4% be set on the outside of the curved section. Crash barriers must be set on high-slope sections, with a height of no less than 80cm.

2. Production Facility Standards

sand and gravel processing system must be equipped with a three-level sedimentation tank, and the sewage retention time must be no less than 2 hours. The dust emission concentration limit of the concrete mixing plant is 20mg/m³.


Suggestions for the implementation of the standard

  1. Establish a special fund for civilized construction (not less than 0.5% of the project cost)
  2. Promote the QR code equipment management system
  3. Carry out monthly civilized construction star rating

Technology evolution analysis

Compared with the 2008 version, the 2019 version adds 16 intelligent requirements, including:

  • Online monitoring of construction dust
  • Digital control of energy consumption
  • Electronic fencing in dangerous areas

Sample only — not a preview of DL/T 5798-2019
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL 5073-1997 in English

    DL 5073-1997 in English

    Code for seismic design of hydraulic structures

    1997-08-04