DL/T 5802-2019 in English
VALIDCode for construction and acceptance of gas-insulated metal-enclosed 1000kV transmission line in tubular tunnel
- Issued on:2019-11-04
- Implemented on:2020-05-01
- File Format:PDF
- Delivery:Via email within 5 business days
Price(USD):
$630.00
$612.00
$612.00
Introduction
This standard provides detailed specifications for the construction and acceptance of 1000kV gas-insulated metal-enclosed transmission lines in tunnel engineering projects. It covers various aspects including technical requirements, construction procedures, quality control measures, and inspection methods. The document outlines the necessary steps to ensure safety, reliability, and performance during the installation and commissioning phases. It also includes guidelines for material selection, equipment handling, and environmental protection. The standard aims to establish uniform practices and ensure consistency in the execution of such high-voltage transmission line projects. It addresses key components such as installation techniques, testing procedures, and documentation requirements to support effective project management and long-term operational efficiency.
*** Please note: This description may not be accurate, please refer to the official documentation.
Sample only — not a preview of DL/T 5802-2019

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26 -

DL/T 790.11-2001 in English
Distribution Automation Using Distribution Line Carriers Part 1: General Part 1: Architecture of Distribution Automation Systems
2001-12-26