Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
system valve closing time test electro-hydraulic regulation system test items basic test guide primary frequency regulation test requirement static test drying reactors galvanothermy board mb-ofdm air interface
DL/T 711-2019 in English

DL/T 711-2019 in English

VALID

Test guide of steam turbine governing system

  • Issued on:2019-06-04
  • Implemented on:2019-10-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $340.00
$330.00
Standard No: DL/T 711-2019
Document status: VALID
Title in English: Test guide of steam turbine governing system
Title in Chinese: 汽轮机调节保安系统试验导则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2019-06-04
Implemented on: 2019-10-01
Superseding: DL/T 711-1999 Test guide of steam turbine governing system
Professional Classification: DL-Electricity
Related Keywords: system valve closing time test
electro-hydraulic regulation system test items basic
test guide
primary frequency regulation test requirement
static test
Related Topics: steam turbine
Adjust machine feet
Test System Parameters
security guard
dl/t711
Test Guidelines
dl t711-1999
dl t711
Steam Turbine Overhaul Guidelines
Adjustment handwheel
dl/t2011-2019
dl/t711-2019
dl/t1966-2019
dl/t5784-2019
dl/t5787-2019
dl/t 711-2019
dl/t 5786-2019
dl/t 799 -2019
dl/t 5796-2019


Introduction

Analysis of the core content of the standard

Comparison dimensions DL/T 711-1999 DL/T 711-2019
Scope of application Pure hydraulic regulation system Mainly electro-hydraulic regulation system
Test items Basic static/dynamic test Six new tests including DEH simulation and primary frequency modulation
Technical indicators Delay rate ≤0.15% Grading requirements (≤0.06%-0.15%)

Key test technical points

1. Static test of regulating system

Valve closing time test:The total closing time of the main steam valve is required to be ≤0.3s (P>600MW unit), and the LVDT sensor is used to record the action curve. The delay time t1 and the closing time t2 need to be measured multiple times to obtain the average value.

Typical case: In the test of a 1000MW unit, the closing time of the high-pressure regulating valve was shortened from 0.35s to 0.28s by optimizing the response speed of the oil motor servo valve.


2. Dynamic characteristics test

Contains comparison of three test methods:

  • Conventional load shedding method: Directly decouple the generator and measure the speed rise curve
  • Dynamometer method: Keep the control valve closed in the grid-connected state and calculate the speed by power integration
  • OPC test: 103% rated speed triggers protection action

Safety threshold: The maximum speed of critical overspeed shall not be greater than 18% of the rated speed (i.e. 3540r/min)


Highlights of standard revision

  1. Delete the relevant provisions of pure hydraulic system and focus on electro-hydraulic control technology
  2. Newly added primary frequency regulation test requirement: ±0.067Hz~±0.1Hz step disturbance test is required at 60%/75%/90% load point
  3. Introduced regulation system modeling test, requiring the establishment of a PSASP/PSD-BPA compatible mathematical model

Implementation suggestions

1. Test preparation phase: It is necessary to verify that the measurement deviation of the TSI speed probe and the DEH control system should be <0.1%

2. Data acquisition requirements: The sampling frequency of key parameters (such as oil motor stroke) is not less than 100Hz

3. Safety protection: The bypass system should be kept in hot standby status during the load rejection test, and the boiler pressure relief valve should be calibrated in advance

Sample only — not a preview of DL/T 711-2019
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26