DL/T 712-2000 in English
SUPERSEDEDGuideline for the selection of condenser tube materials in power plant
- Issued on:2000-11-03
- Implemented on:2001-01-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$250.00
$243.00
$243.00
| Standard No: | DL/T 712-2000 |
| Document status: | SUPERSEDED |
| Superseded by: |
DL/T 712-2010 Guideline for the selection of condenser and auxiliary cooler tube materials in power plant
|
| Superseded on: | 2011-05-01 |
| Title in English: | Guideline for the selection of condenser tube materials in power plant |
| Title in Chinese: | 火力发电厂凝汽器管选材导则 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2000-11-03 |
| Implemented on: | 2001-01-01 |
| Chinese Classification: | P61-Power station engineering |
| Professional Classification: | DL-Electricity |
| Related Keywords: | condenser tube materials
power plant condenser plant power |
| Related Topics: | dl2000
dl-2000 firepower dl 2000 dl+2000 power plant material selection dl2000+ Illuminator manufacturers thermal power plant dl2000dl dl2000 dl dissolved solids condenser pipe Tube condenser manufacturer Conductivity generator Material acceptance of thermal power plant gb/t 712-2000 |
本导则规定了火力发电厂表面式凝汽器管材的选用技术条件。
本导则适用于火力发电厂及原子能发电厂表面式凝汽器管材的选用,其他以水为冷却介质的表面式凝汽器管材的选用也可参考。
Sample only — not a preview of DL/T 712-2000

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DLGJ 9-1992 in English
Regulations for content and depth of preliminary design document of fossil fuel power plants
1992-03-09 -

DLGJ 17-1981 in English
Technical regulations for design of thermal power plant
- -

DLGJ 116-1993 in English
Technological regulations for furnace safeguard supervisory system in fossil fuel power plant
1994-01-01