Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
thermal power plant dl/t thermal power plants thermal power equipment power plant dl/t thermal power erection natural grassland scopethis standard spiral mixers prestreesed concrete cylinder pipe scopethis school regulation
DL/T 889-2015 in English

DL/T 889-2015 in English

VALID

Guideline for Chemistry Supervision of Thermal Equipments during Power Station Capital Comstriction

  • Issued on:2015-07-01
  • Implemented on:2015-12-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $240.00
$233.00
Standard No: DL/T 889-2015
Document status: VALID
Title in English: Guideline for Chemistry Supervision of Thermal Equipments during Power Station Capital Comstriction
Title in Chinese: 电力基本建设热力设备化学监督导则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2015-07-01
Implemented on: 2015-12-01
Superseding: DL/T 889-2004 Guide of chemistry supervision of thermal equipments for power station capital construction
Professional Classification: DL-Electricity
Related Keywords: thermal power plant dl/t
thermal power plants
thermal power equipment
power plant dl/t
thermal power erection
Related Topics: supervision
Electrochemical equipment
Electrochemical equipment
dl/t 1475-2015
heat
dl/t 5719-2015
High-quality electrochemical equipment
High quality electrochemical equipment
salt water equipment
supervision advice
Strengthen supervision and re-supervision
salt water equipment
Supervisory taste
infrastructure
kinetic thermodynamics
Thermodynamic test
Supervise English
dl/t422-2015
dl/t 1490 2015
DL/T 5498-2015
DL/T 5499-2015
DL/T 5502-2015
DL/T 5503-2015
DL/T 5504-2015
DL/T 5505-2015
DL/T 5506-2015
DL/T 5507-2015
DL/T 5509-2015
DL/T 5715-2015
DL/T 5716-2015
DL/T 5717-2015
DL/T 5718-2015
DL/T 5721-2015
DL/T 5722-2015
DL/T 5723-2015
DL/T 5724-2015
DL/T 5725-2015
DL/T 5726-2015
Chemical Surveillance Guidelines
Thermal equipment
Guidelines for Supervision Documents of Electric Power Construction Projects
DL∕T 889-2015 Chemical Supervision Guidelines for Thermal Equipment in Electric Power Infrastructure
electrochemistry
ny/t 889


1 Scope

This standard specifies the content and technical requirements of chemical supervision in the basic construction stage of power generation and thermal equipment.

This standard is applicable to units with rated pressure of 12.7 MPa and above for thermal equipment in thermal power plants. Units with rated pressure lower than 12.7 MPa may be implemented with reference.

2 Normative references

The following referenced documents are indispensable for the application of this standard. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced documents (including any amendment) applies.

GB/T 7596 In-service quality criteria of turbine oils used in power plants
GB 8978 Integrated wastewater discharge standard
GB 12145 Quality criterion of water and steam for power plant and steam-generating equipment
GB/T 14541 Guide for maintenance and supervision of in-service mineral turbine oil used for power plants
DL/T 246 Guideline of chemical supervision
DL/T 300-2011 Guideline for anti-corrosion and anti-fouling of condenser tube in power plant
DL/T 561 Guide for chemical supervision of water and steam in thermal power plant
DL/T 571 Guide for acceptance, in-service supervision and maintenance management of fire-resistant fluid used in power plants
DL/T 712 Guideline for the selection of condenser tube materials in power plant
DL/T 794 Guideline for chemical cleaning of fossil plant
DL/T 801 Requirements for internal cooling water quality and it's system in large generators
DL/T 855 The code for maintenance and safe keeping of thermal power equipment in electric power construction
DL/T 912 Quality criterion of water and steam for supercritical pressure units in fossil fuel power plant
DL/T 956 Guideline for lay-up of thermal power equipment in fossil plants
DL 5190.3 Technical specification for thermal power erection and construction — Part 3: steam turbine generator unit
DL 5190.5 Technical specification for thermal power erection and construction — Part 5: Piping and system

3 General

3.1 The chemical supervision of thermal equipment in thermal power plants in the capital construction stage shall meet the general requirements of DL/T 246 for chemical supervision of thermal power plants.

3.2 The chemical supervision of thermal equipment in thermal power plants in the capital construction stage shall be organized by the owner or the unit entrusted by the owner, with the participation of the owner unit, the construction unit, the supervision unit, the commissioning unit and other units.

3.3 The owner unit shall participate in the quality acceptance of important projects such as boiler hydraulic test, boiler chemical cleaning, steam pipe blowing, unit trial operation and 168 h complete trial operation. All supervision tasks shall be included in the project schedule, and their implementation shall be taken as one of the bases for assessing and evaluating the project quality.

3.4 The owner unit is responsible for organizing the collection and collation of chemical technical supervision and inspection reports in the capital construction stage of thermal equipment, and archiving them as the basic data of the unit.

Foreword i
1 Scope
2 Normative references
3 General
4 Ex-factory inspection and requirements
5 On-site storage and supervision
6 Installation and hydrostatic test
7 Chemical cleaning
8 Water flushing before starting the whole set of units
9 Steam blowing
10 Start-up and commissioning of the whole set of units
11 Anti-rust protection

Sample only — not a preview of DL/T 889-2015
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL/T 690-2013 in English

    DL/T 690-2013 in English

    Synthetic Testing of High-voltage Alternating Current Circuit-breakers

    2013-11-28