DL/T 895-2004 in English
SUPERSEDEDGuide of operation for ash and slag handling system in power plant
- Issued on:2004-10-20
- Implemented on:2005-04-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$210.00
$204.00
$204.00
| Standard No: | DL/T 895-2004 |
| Document status: | SUPERSEDED |
| Superseded by: |
DL/T 895-2024 Operation Guidelines for Ash and Slag Removal Systems
|
| Superseded on: | 2024-11-24 |
| Title in English: | Guide of operation for ash and slag handling system in power plant |
| Title in Chinese: | 除灰除渣系统运行导则 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2004-10-20 |
| Implemented on: | 2005-04-01 |
| ICS Classification: | 27.100-Power stations in general |
| Chinese Classification: | F23-Power plant and electric power system operating maintenance |
| Professional Classification: | DL-Electricity |
| Related Keywords: | slag handling system
power plant scopeee te basic requirements slag plant power |
| Related Topics: | slag
Ash Percentage of slag ash Water System Degassing Northeast slag remover Haze system Haze system dl/t+895 Composition of ash Slag industry Biomass ash System trial run execution Slag remover international Casting slag remover dl/t 887 2004 Residual oil execution |
本标准规定了燃煤火电机组编制除灰除渣系统运行规程的基本要求。
本标准适用于火力发电厂单机额定容量为125MW 及以上燃煤火电机组除灰除渣系统的运行和设备操作以及相应厂级除灰除渣系统运行规程的编制。对于单机额定容量125MW 以下的火力发电机组,其除灰除渣系统的运行亦可参照本标准执行。
Scope
Ee Te Basic requirements of travel regulations.
Sample only — not a preview of DL/T 895-2004

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 956-2017 in English
Guide for lay-up of thermal power equipment in fossil fuel power plant
2017-08-02 -

DL/T 2506-2022 in English
Technical guidelines for energy-saving operation optimization of environmental protection facilities in coal-fired power plants
2022-05-13