FD 005-2008 in English
VALIDPreparation rules of offshore windpower projects planning report
- Issued on:2009-01-01
- Implemented on:2009-01-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$120.00
$117.00
$117.00
| Standard No: | FD 005-2008 |
| Document status: | VALID |
| Title in English: | Preparation rules of offshore windpower projects planning report |
| Title in Chinese: | 近海风电场工程规划报告编制办法(试行) |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2009-01-01 |
| Implemented on: | 2009-01-01 |
| Related Keywords: | wind farm engineering planning
offshore windpower projects planning preparation rules report scopethis standard applies |
| Related Topics: | close
wind power wind farm Method Overseas inspection report Near Field Test System Trial Standard trial run planning standards offshore farm near field of electric quadrupole 14th five-year planning work planning report Preparation method of planning report for offshore wind farm project (Trial) Power frequency withstand voltage test report Wind farm engineering technology Prepare method validation report jjf jl 005-2008 |
为合理开发利用近海风能资源,确保近海风电场工程建设的有序开展,特制定本标准。本标准规定了编制近海风电场工程规划报告应遵循的原则、工作程序、工作内容、应满足的工作深度和技术要求。
Scope
This standard applies to national or provincial (autonomous regions, municipalities) level offshore wind farm engineering planning, and other regional offshore wind farm engineering planning shall be implemented with reference.
Sample only — not a preview of FD 005-2008

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

FD 006-2008 in English
Preparation rules of offshore windpower projects pre-feasibility study report
2009-01-01 -

FD 008-2011 in English
Technical code for construction planning of offshore wind power projects
- -

FD 007-2011 in English
Preparation rules of offshore windpower projects feasibility study report
- -
