Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
coal mining part shaft excavation diameter blind shaft modern shaft composite shaft air humidity port tugboat operations pollution-free food broilers
GB/T 15663.2-2023 in English

GB/T 15663.2-2023 in English

VALID

Vocabulary of coal mining—Part 2: Shaft and drift engineering

  • Issued on:2023-05-23
  • Implemented on:2023-12-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $750.00
$728.00
Standard No: GB/T 15663.2-2023
Document status: VALID
Title in English: Vocabulary of coal mining—Part 2: Shaft and drift engineering
Title in Chinese: 煤矿科技术语 第2部分:井巷工程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2023-05-23
Implemented on: 2023-12-01
Superseding: GB/T 15663.2-2008 Terms relating to coal mining - Part 2: Shafting and drifting engineering
ICS Classification: 01.040.73-Mining and minerals (Vocabularies)
Chinese Classification: D04-Basic standard and general method
Professional Classification: GB-National Standard
Related Keywords: coal mining part
shaft excavation diameter
blind shaft
modern shaft
composite shaft
Related Topics: science and technology
Coal Mining Science and Technology Terminology Coal Preparation
technology standard
Coal Mining Science and Technology Terminology Coal Preparation
Coal Mining Technology Terminology
engineering technology
technology engineering
Technology
engineering technology
technology engineering
Super Technology Engineering
Technology assists engineering
Measuring regulations for shaft engineering
Mine with one million tons of coal
Same coal high-quality mine
Coal Mining Technology Terminology
GB/T 15663.2
GB/T 15663.2-1995
GB/T 15663.2-2008
Kekao No. 2 well
Ministry of Science and Technology High-tech Department Ministry of Industry and Information Technology
Division of work of Zhang Yudong, Ministry of Science and Technology
Underground coal mine dispatching system
Coal mine tunnel industry

《GB/T 15663.2-2023煤矿科技术语 第2部分:井巷工程》由TC42(全国煤炭标准化技术委员会)归口,主管部门为中国煤炭工业协会。


Introduction

Background of Standard Revision and Technological Evolution

GB/T 15663.2-2023, as the second part of the coal mine scientific and technological terminology series standards, is a comprehensive upgrade of the 2008 version of the standard. This revision is mainly based on:

  • Elimination of terms related to backward technologies and processes (e.g. deletion of 12 items such as curtain drilling method)
  • Addition of new technical terms for modern shaft and tunnel engineering (e.g. 102 items such as shaft boring machine and directional drilling)
  • Optimization of the accuracy of term definitions (adjustment of 108 definitions such as blind shaft and composite shaft lining)

Comparison of core terminology systems

ClassificationTerminology volume of 2008 versionTerminology volume of 2023 versionMain changes
Basic terms2634Additional terms such as gentle slope inclined shaft and Safety Chamber, etc.
Special Well Drilling Method1832Strengthening new technologies such as S-type Grouting Hole, freezing-injection-drilling parallel operation, etc.
Support Terminology2828Detailed Differences between Wet Jetting and Tidal Jetting Processes

Key Technology Breakthroughs

1. Directional Drilling Technology System

Newly Added L-type Grouting Hole (vertical to horizontal), Terms such as class=instrument>S-type grouting hole (three-dimensional steering) reflect the development of precise grouting technology in complex formations.

2. Freezing process upgrade

Improve the freezing wall parameter system and clarify:

  • Average freezing wall temperature: -15℃~-25℃ design threshold
  • Handover time: needs to be controlled within 7-15 days
  • Multi-circle hole freezing: main freezing hole + auxiliary hole + anti-flaking hole coordinated arrangement

Implementation suggestions

  1. During the conversion period between the old and new terminology, attention should be paid to the differences in the expression of key parameters such as shaft excavation diameter (formerly "wild diameter")
  2. The selection of special construction methods should refer to the newly added quantitative indicators such as well deviation rate ≤0.5%
  3. The monitoring terminology system (such as well wall non-destructive testing) needs to be equipped with corresponding sensor standards

Sample only — not a preview of GB/T 15663.2-2023
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend