Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
stainless steel thin-walled stainless steel pipe austenitic stainless steel connecting steel pipe steel pipes mixers admitance method scopethis standard confidential archives
GB/T 19228.1-2024 in English

GB/T 19228.1-2024 in English

VALID

Stainless steel press-fitting assemblies—Part 1:Press-fittings

  • Issued on:2024-09-29
  • Implemented on:2025-04-01
  • File Format:PDF
  • Delivery:Via email within 8 business days
Price(USD): $640.00
$621.00
Standard No: GB/T 19228.1-2024
Document status: VALID
Title in English: Stainless steel press-fitting assemblies—Part 1:Press-fittings
Title in Chinese: 不锈钢卡压式管件组件 第1部分:卡压式管件
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 8 business days
Issued on: 2024-09-29
Implemented on: 2025-04-01
Superseding: GB/T 19228.1-2011 Stainless steel press-fitting assemblies—Part 1:Press-fittings
ICS Classification: 23.040.60-Flanges, couplings and joints
Chinese Classification: J15-Pipeline fittings
Professional Classification: GB-National Standard
Related Keywords: stainless steel
thin-walled stainless steel pipe
austenitic stainless steel
connecting steel pipe
steel pipes
Related Topics: Compression fitting copper
Cassette Moisture Analysis
Tube
Cassial vasculitis
GB/T 19228.1
GB/T 19228.1

《GB/T 19228.1-2024不锈钢卡压式管件组件 第1部分:卡压式管件》由TC237(全国管路附件标准化技术委员会)归口,主管部门为中国机械工业联合会。


Introduction

Interpretation of the core content of the standard

Main updates of the 2024 version: Nominal pressure increased to PN25, new European standard series sizes, strengthened additional requirements for sealing rings and steel pipes, and optimized hot and cold water circulation tests

Pipe fittings classification system

Classification dimensionsS type (with extended straight section)D type (without extended straight section)
CapCAPCAP
TeeT/TR seriesT/TR series
Elbow90E/45E90E/45E

Key technical requirements

Material specifications

  • Main material: Austenitic stainless steel such as S30408/S31603
  • Sealing ring: Rubber material in accordance with GB/T 19228.3
  • Connecting steel pipe: Thin-walled stainless steel pipe in accordance with GB/T 19228.2

Performance indicators

Test itemsS-type requirementsD-type requirements
Hydraulic pressure test≥3.75MPa≥2.5MPa
Tensile pull-out strength (DN50)15.2kN9.72kN
Salt spray test240 hours without rust

Implementation suggestions

Selection considerations

  1. Gas pipelines should preferably use S31603 material
  2. For DN65 and above, it is recommended to use S type II series to enhance the pressure bearing capacity
  3. The sealing ring should be checked before installation>Sectional diameter tolerance ±0.4mm

Installation quality control points

  • The size of the clamping tool jaws must comply with the requirements of Appendix C
  • The hot and cold water system needs to be verified by 1000 temperature cycles
  • In vibration situations, 1 million vibration tests

Standard evolution analysis

Compared with the 2011 version, this revision focuses on strengthening the following:

  • Pressure level expansion: New PN25 applicable scenarios
  • Dimension system improvement: Add European standard series and socket end size $L_\Delta$
  • Test method upgrade: Hot and cold water cycle test is changed to dynamic alternating test

Sample only — not a preview of GB/T 19228.1-2024
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend