GB/T 19229.3-2012 in English
VALIDCoal-fired flue gas desulphurization equipment - Part 3:The equipment for coal-fired flue gas desulphurization by seawater
- Issued on:2012-11-05
- Implemented on:2013-06-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$204.00
《GB/T 19229.3-2012燃煤烟气脱硫设备 第3部分:燃煤烟气海水脱硫设备》由TC275(全国环保产业标准化技术委员会)归口,主管部门为国家发展和改革委员会。
Scope
This part of GB/T 19229 specifies the terms and definitions, process systems, technical requirements, inspection and acceptance, signs, signs, packaging, transportation and storage of coal-fired flue gas seawater desulfurization equipment. This part applies to the equipment used in new construction, expansion and reconstruction of coal-fired thermal power plant boilers or heating boilers, or seawater desulfurization projects for existing boilers. When the exhaust gas treatment of coal-fired, oil-fired and gas-fired boilers in other industries is suitable for flue gas and seawater desulfurization measures, it can be referred to for implementation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 28739-2025 in English
Kitchen waste treating and utilizing equipments in catering services
2025-10-31 -

GB/T 37819-2019 in English
Bi-circulation power generation unit for low-temperature waste heat recovery
2019-08-30 -

GB/T 32156-2015 in English
Commissioning specification for coal-fired flue gas denitration equipment
2015-10-09 -

GB/T 42767-2023 in English
General requirements for setting of municipal solid waste collecting devices
2023-05-23 -

GB/T 33566-2017 in English
Pusher submersible agitator
2017-05-12 -

GB/T 16845-2017 in English
Dust collector―Terminology
2017-05-12 -

GB/T 27871-2011 in English
Sanitary landfill compactor
2011-12-30 -

GB/T 19054-2025 in English
General technical conditions for fuel oil cremator
2025-12-31