GB/T 21440.3-2008 in English
VALIDInstrument for dam monitoring - Settlement gauge - Part 3:Hydraulic pressure type settlement gauge
- Issued on:2008-06-17
- Implemented on:2008-10-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$97.00
《GB/T 21440.3-2008大坝监测仪器 沉降仪 第3部分:液压式沉降仪》由332(水利部)归口,主管部门为水利部。
GB/T21440《大坝监测仪器 沉降仪》分为四个部分,本部分为GB/T21440的第3部分。GB/T 21440的本部分规定了液压式沉降仪的术语和定义、技术要求、试验方法、检验规则以及标志、包装、运输、贮存等。本部分适用于土石坝和填方等工程监测用的埋入式的液压式沉降仪。
Scope
This part of GB/T 21440 specifies the terms and definitions, technical requirements, test methods, inspection rules, signs, packaging, transportation, storage, etc. of hydraulic settlement instruments. This part applies to embedded hydraulic settlement instruments used for engineering inspections of earth-rock dams and fills.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 15406-2007 in English
Primary parameter and general specification for geotechnical engineering instrument
2007-06-11 -

GB/T 32747-2016 in English
Safety requirements for geotechnical engineering instruments
2016-06-14 -

GB/T 38204-2019 in English
Geotechnical engineering instrument—Inclino meters
2019-06-04 -

GB/T 21029-2007 in English
Series and type spectrum of geotechnical engineering instrument
2007-06-11 -

GB/T 24105-2009 in English
Basic conditions and methods of environmental test for geotechnical engineering instrument
2009-06-12 -

GB/T 4935.2-2009 in English
Instrument for soil test—Oedometer—Part 2:Pneumatic oedometer
2009-06-12 -

GB/T 21440.1-2008 in English
Instrument for dam monitoring—Settlement gauge—Part 1:Hydraulic overflow settlement gauge
2008-02-15