Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
vitamin b12 content assessment values natural gas media
GB/T 21697-2022 in English

GB/T 21697-2022 in English

VALID

Insulation coordination of lightning overvoltage for low-voltage distribution wiring and electronic systems

  • Issued on:2022-07-11
  • Implemented on:2023-02-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $310.00
$301.00

《GB/T 21697-2022低压配电线路和电子系统中雷电过电压的绝缘配合》由TC258(全国雷电防护标准化技术委员会)归口,主管部门为国家标准化管理委员会。


Introduction

Key points of the new standard revision

Elements2008 Edition2022 EditionTechnological Evolution
Equipment Classification2-level withstand voltage division3-level rating systemNewly added Class III electronic equipment threshold
Insulation Test6kV Basic Test12kV Multi-scenario SimulationIntroduction of Multi-dimensional Superimposed Stress Judgment
Surge protection devicePulse width and frequency limitationCompound waveform adaptation technologyMeet the needs of new semiconductor equipment

Lightning overvoltage typing response strategy

  • Direct lightning protection: The tower base grounding resistance should not exceed 10Ω
  • Inductive lightning blocking: The cable shielding layer overlap rate must reach 85%
  • Deeply buried pipeline layout: It is recommended to be ≥3 meters away from the working surface of the building

Medical building implementation case

A third-level isolation transformer and Class IV SPD combination solution are used in a tertiary hospital in Hainan to achieve induced lightning overcurrent suppression of 34%, BS EN 62305 certification test compliance rate is 91.7%.


Insulation coordination parameter matrix

Equipment environmentInsulation coefficient KNoise attenuationDischarge ranging
Grade A communication environment1.3~1.8-62dB≥5m
Railway transportation facilities2.0~2.5-75dB≥8m
Petrochemical Zone2.3~2.9-82dB≥12m

Implementation Suggestions and Technical Route

Low Voltage RPU Measurement and Verification Process:

  1. Pre-check the line layer crosstalk value, the total harmonic current needs to be ≤3.2%Ir
  2. Multi-spectrum dual-trigger surge calibration, avoidance period ≤15 seconds
  3. Execute virtual hardware in the loop procedures

Full life cycle management:

Configure intelligent self-check>Live working monitor, real-time collection of impact residual pressure year-on-year baseline data, the official recommended maintenance cycle is 12~15 months.

Sample only — not a preview of GB/T 21697-2022
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 37047-2022 in English

    GB/T 37047-2022 in English

    Cloud-to-ground lightning density based on lightning location systems(LLS)—General principles

    2022-07-11