Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
test requirements test guide current transformer test requirements type test routine test damage mechanisms irrigation water quota scopethis standard single chemical control
GB/T 22071.1-2008 in English

GB/T 22071.1-2008 in English

SUPERSEDED

Test guide for instrument transformers - Part 1: current transformers

  • Issued on:2008-06-30
  • Implemented on:2009-04-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $360.00
$350.00
Standard No: GB/T 22071.1-2008
Document status: SUPERSEDED
Superseded by: GB/T 22071.1-2018 Test guide for instrument transformers—Part 1:Current transformers
Superseded on: 2019-07-01
Title in English: Test guide for instrument transformers - Part 1: current transformers
Title in Chinese: 互感器试验导则 第1部分: 电流互感器
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2008-06-30
Implemented on: 2009-04-01
ICS Classification: 29.180-Transformers. Reactors
Chinese Classification: K41-Transformer
Professional Classification: GB-National Standard
Related Keywords: test requirements
test guide
current transformer test requirements
type test
routine test
Related Topics: iec61869 Transformer
influenza hemagglutination test
Current Transformer
flu m2
Inductance
current in english
Transformer
Test Guidelines
flu rna
GB/T 22071.1
GB/T 22071.1-2008
GB/T 22071.1-2018
Verification Regulations for Power Transformers
Current transformer (dry type)
electric current
Current transformer test
Inductive conductivity
The difference between current sensor and current transformer
dl866 current transformer
Influenza Parainfluenza Satellite Experiment
Canadian current transformer
Current transformer identification
Standard current transformer rating
National standard parameters of current transformer
Transformer ratio test
DC method to test the polarity of current transformer
Testing of current transformers
Voltage transformer ratio test
Combined transformer test method
Inductive current probe testing
Current transformer saturation current test
Current transformer saturation
European standard transformer
Current transformer Australian standard number

《GB/T 22071.1-2008互感器试验导则 第1部分: 电流互感器》由TC222(全国互感器标准化技术委员会)归口,主管部门为中国电器工业协会。
《互感器试验导则》标准目前包含了2个部分,本部分为《互感器试验导则》标准的第1部分。GB/T 22071的本部分提出的电流互感器试验要求适用于GB 1208-2006和GB 16847-1987等标准中所规定的型式试验、例行试验和特殊试验。本部分规定了互感器的试验项目、试验顺序、一般试验条件、试验要求和型式试验的补充要求。本部分针对GB 1208-2006《电流互感器》和GB 16847-1987《保护用电流互感器暂态特性技术要求》中所规定的试验项目而提出指导性试验方法。此外,本部分还提出了目前行业上广泛采用的绝缘电阻测量和伏安特性测量两项试验方法(这两个项目在GB 1208-2006《电流互感器》等标准中并未予规定)。本部分规定的试验方法可能不是唯一的,但却是目前互感器行业广泛采用的方法。


Scope

The current transformer test requirements proposed in this part of GB/T 22071 are applicable to the type test, routine test and special test specified in standards such as GB 1208-2006 and GB 16847-1997. This part specifies the test items, test sequence, general test conditions, test requirements and supplementary requirements for type tests of transformers.

Sample only — not a preview of GB/T 22071.1-2008
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend