Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
energy performance energy benchmark energy consumption benchmark energy performance parameters new energy common brake special standard improvement range protein requirement polyacrylonitrile-ammonium
GB/T 24915-2020 in English

GB/T 24915-2020 in English

VALID

Guidance on energy performance contracting

  • Issued on:2020-03-31
  • Implemented on:2020-10-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $430.00
$418.00

《GB/T 24915-2020合同能源管理技术通则》由TC20(全国能源基础与管理标准化技术委员会)归口,主管部门为国家标准化管理委员会。


Introduction

Core changes in the standard revision

Revision dimensions 2010 version 2020 version
Referenced standards 6 basic standards 3 new energy management system standards including GB/T 23331
Definition of terms "Energy consumption benchmark" Changed to "Energy benchmark" and expanded technical parameters
Contract type Energy saving benefit sharing type only New energy saving guarantee type and energy cost trusteeship type contract templates

Analysis of key technical requirements

Case study of energy benchmark establishment

In a central air-conditioning system renovation project in a hospital, the energy performance parameters determined through 90-day base period monitoring include:

  • Average daily power consumption in cooling season: 1250kWh
  • COP value: 2.8
  • Temperature compliance rate: 92%

Implementation suggestions

Four-step method for energy saving verification

  1. Select the measurement method (option method specified in GB/T 28750)
  2. Determine the calibration period (no less than 30 days)
  3. Implement M&V plan (including equipment records and instrument calibration records)
  4. Prepare verification report (signature confirmation by both parties is required)

Typical problem: A factory lighting renovation project did not establish an initial energy consumption record, resulting in energy savings disputes

Sample only — not a preview of GB/T 24915-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend