Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
primary post-type lithium battery insulators primary lithium battery primary post lithium battery insulator products pillar scopethis standard primary epoxy resin composites civil aircraft maintenance energy-saving specifications
GB/T 26047-2010 in English

GB/T 26047-2010 in English

SUPERSEDED

Insulators of primary lithium battery for pillar

  • Issued on:2011-01-10
  • Implemented on:2011-10-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00
Standard No: GB/T 26047-2010
Document status: SUPERSEDED
Superseded by: GB/T 26047-2022 Insulators of primary lithium battery for pillar
Superseded on: 2023-02-01
Title in English: Insulators of primary lithium battery for pillar
Title in Chinese: 一次柱式锂电池绝缘子
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2011-01-10
Implemented on: 2011-10-01
ICS Classification: 77.160-Powder metallurgy
Chinese Classification: H72-Powder metallurgy material and product
Professional Classification: GB-National Standard
Related Keywords: primary post-type lithium battery insulators
primary lithium battery
primary post lithium battery insulator products
pillar scopethis standard
primary
Related Topics: lithium battery
insulator
column english
Pillar Pillar
New lithium battery
column english
Molecular weight of lithium
A lithium battery pole seat
Molecular weight of lithium
batteries in the same batch
Lithium battery low frequency
Atomic lithium battery
Ion column
take the lead
Lithium battery 1
lithium battery lithium lithium
primary button battery
Domestic lithium battery
standard insulator
Molecular weight of lithium
pillar when pillar
Lithium acetate insulator
Lithium battery gram capacity
Chi Zhuzi
GBT26047
GB/T 26047-2010
GB/T 26047-2022
Lithium battery primary injection
Lithium-ion cells and batteries for stationary electronic equipment
Lithium Metal and Lithium Ion Batteries
Lithium battery into the network
Lithium battery advantages and disadvantages
Lithium battery platform time
Battery voltage is different
column
Go out together after passing the pillar point
Lithium battery insulation test principle
Lithium battery cycle test
Lithium battery capacity definition
Lithium battery foreign matter control
Battery pack insulation withstand voltage test
Domestic lithium battery industry
Insulation column quality line
Lithium battery cycle times
Lithium content of lithium battery packaging
Battery insulation withstand voltage test
Accelerated test of lithium manganese primary battery

《GB/T 26047-2010一次柱式锂电池绝缘子》由TC243(全国有色金属标准化技术委员会)归口,TC243SC3(全国有色金属标准化技术委员会稀有金属分会)执行,主管部门为中国有色金属工业协会。


Scope

This standard specifies the requirements, test methods, inspection rules and marking, packaging, transportation, storage, quality certificate and contract (or order form) content of primary post-type lithium battery insulators. This standard applies to primary post lithium battery insulator products.

Sample only — not a preview of GB/T 26047-2010
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend