Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
ph value control drilling fluid needs technical requirements key technical requirements standard revision technical areas requirements shear gate control handle copy paper scopethis standard unhulled oilseeds scopethis standard capability welder function single welding function welding + heat treatment integration increase
GB/T 31033-2025 in English

GB/T 31033-2025 in English

VALID

Technical requirements for well control technology of oil & gas drilling

  • Issued on:2025-02-28
  • Implemented on:2025-09-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $585.00
$568.00
Standard No: GB/T 31033-2025
Document status: VALID
Title in English: Technical requirements for well control technology of oil & gas drilling
Title in Chinese: 石油天然气钻井井控技术要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2025-02-28
Implemented on: 2025-09-01
Superseding: GB/T 31033-2014 Specification for well control technology of oil & gas drilling
ICS Classification: 75.020-Extraction and processing of petroleum and natural gas
Chinese Classification: E13-Petroleum drilling
Professional Classification: GB-National Standard
Related Keywords: ph value control drilling fluid needs
technical requirements
key technical requirements
standard revision technical areas requirements
shear gate control handle
Related Topics: GB/T31033-2014
Oil Drilling Drill Pipe
Oil and gas well tubing string selection technology

《GB/T 31033-2025石油天然气钻井井控技术要求》由TC355(全国石油天然气标准化技术委员会)归口,TC355SC4(全国石油天然气标准化技术委员会钻井工程分会)执行,主管部门为国家标准委。


Introduction

Core changes in the standard revision

Technical areas Requirements of the 2014 version Updates to the 2025 version
Definition of sour wells Hydrogen sulfide>50ppm Hydrogen sulfide>75mg/m³ (equivalent to 50ppm)
Blowout preventer configuration Maximum pressure of 70MPa Newly added 140MPa blowout preventer combination
Safety distance Including mine passage requirements Delete the mine distance clause, and add 8m spacing between sulfur-containing wells

Analysis of key technical requirements

4.1 Well site safety layout

The new standard clearly states: The distance between high-voltage lines is ≥75m, schools and hospitals are ≥500m, and sulfur-containing oil and gas wells (H₂S≥1000ppm) must maintain a well spacing of drilling platform length + 8m.

4.6 Drilling fluid density design

Case: The measured formation pressure of a gas well is 70MPa. According to the new standard, it is required to:

  • Benchmark density: equivalent formation pressure equivalent value
  • Additional safety value: 0.07-0.15g/cm³ or 3.0-5.0MPa
  • Sulfur-containing formation: the upper limit value must be taken

Well control device management

5.2 BOP remote control console

Installation location requirements: ≥25m from the wellhead, and regulations:

  • Hydraulic pipelines and blowdown pipelines are arranged separately
  • The shear gate control handle needs to be limited to prevent misoperation
  • The fully sealed gate handle needs to be equipped with a protective cover

5.15 Pressure test specifications

Equipment type Test pressure Pressure drop requirement
Annular BOP Rated 70% ≤0.7MPa/10min
Gate BOP Rated pressure ≤0.07MPa(low pressure)

Hydrogen sulfide protection upgrade

8.2.7 PH value control

Drilling fluid needs to be adjusted 50m before drilling into the sulfur-containing layer:

  • Normal situation: pH ≥ 9.5
  • Aluminum drilling tools: 9.5-10.5

9.7 Blowout ignition procedure

Emergency process:

  1. Ignition decision made by the representative of the construction unit
  2. Mobile ignition device is used in the upwind direction
  3. Real-time monitoring of H₂S concentration in the downwind area

Implementation suggestions

Equipment upgrade focus

  • Sulfur-containing wells must be equipped with shear gate blowout preventers
  • Wells above 105MPa need to use Integral flange pipeline

Personnel training requirements

Blowout prevention drill time standard:

  • Drilling/empty well: control within 3 minutes
  • Tripping and lowering drill collars: control within 8 minutes

Sample only — not a preview of GB/T 31033-2025
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend