Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
railway applications insulation coordination part rail transit insulation coordination part application rail transit power supply system equipment railway insulation coordination rail transit overvoltage protection related protection oled material glass transition temperature test method standard dimensions gb/t disc suspension porcelain insulators freight note scopethis part
GB/T 32350.2-2015 in English

GB/T 32350.2-2015 in English

SUPERSEDED

Railway applications — Insulation coordination — Part 2: Overvoltages and related protection

  • Issued on:2015-12-31
  • Implemented on:2016-07-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $100.00
$97.00
Standard No: GB/T 32350.2-2015
Document status: SUPERSEDED
Superseded by: GB/T 32350.2-2025 Railway applications—Insulation coordination—Part 2: Overvoltages and related protection
Superseded on: 2026-07-01
Title in English: Railway applications — Insulation coordination — Part 2: Overvoltages and related protection
Title in Chinese: 轨道交通 绝缘配合 第2部分:过电压及相关防护
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2015-12-31
Implemented on: 2016-07-01
ICS Classification: 45.060-Railway rolling stock
Chinese Classification: S04-Basic standards and general methods
Professional Classification: GB-National Standard
Related Keywords: railway applications insulation coordination part
rail transit insulation coordination part
application rail transit power supply system equipment railway insulation coordination
rail transit overvoltage protection
related protection
Related Topics: insulation coordination
Low voltage track insulation
Insulation coordination part
Insulation coordination part 2
insulation coordination
Rail Transit Insulation
GB/T 32350.2
GB/T 32350.2-2015
Overvoltage and related protection
Overvoltage
Notch pathway-related ligand receptors

《GB/T 32350.2-2015轨道交通 绝缘配合 第2部分:过电压及相关防护》由TC278(全国轨道交通电气设备与系统标准化技术委员会)归口,主管部门为国家铁路局。
GB/T 32350的本部分规定了供电相关设备的瞬时过电压防护的仿真和/或试验要求。?
本部分适用于:?
--地面装置(与变电站变压器次边相连)和与在GB/T 1402-2010中定义的牵引系统接触网相连的机车车辆设备;?
--与列车供电网连接的机车车辆设备。?
本部分不涉及暂时过电压。


Introduction

1. Standard Overview

GB/T32350.2-2015 "Rail Transit Insulation Coordination Part 2: Overvoltage and Related Protection" is China's first standard specifically for rail transit overvoltage protection. It is based on the international standard IEC62497-2:2010 and has been adaptively modified based on China's actual situation.

2. Comparison of standard frameworks

Standard dimensions GB/T32350.2-2015 IEC62497-2:2010 Difference analysis
Normative reference documents GB/T1402-2010, GB11032-2010, etc. IEC60850:2007, IEC60099-4, etc. Domestic standard replacement, stronger adaptability
Scope of application Rail transit power supply system equipment Railway Insulation Coordination Refined into special clauses for overvoltage protection

3. Background of Standard Formulation

With the rapid development of urban rail transit in China, the overvoltage problem faced by the power supply system has become increasingly prominent. The formulation of this standard aims to unify and standardize the insulation coordination technical requirements in the field of rail transit and improve the safety and reliability of equipment.

Case Study: Application of Metal Oxide Surge Arrester

In the rail transit power supply system, metal oxide surge arrester is an important overvoltage protection device. For example, in the practice of Zhuzhou CSR Times Electric Co., Ltd., the reference voltage UP value of the surge arrester was determined through simulation tests (see Table 1) to ensure that it effectively limits the instantaneous overvoltage.

4. Analysis of Technology Evolution

From IEC62497-2 to GB/T32350.2, the technical core of the standard lies in the simulation and test methods of overvoltage. The development trends in recent years include:

  • Simulation technology upgrade: From simple voltage measurement to complex long pulse and short pulse simulation.
  • Protection equipment optimization: The response speed and withstand voltage capability of metal oxide arresters have been significantly improved.

5. Implementation suggestions

Test verification:Suppliers are advised to conduct special overvoltage protection tests for key components according to standard requirements. For example, for equipment with a nominal grid voltage of 1500V, it should be ensured that it can withstand the reference voltage UP value specified in Table 1.

Maintenance management: Establish a regular inspection and maintenance system, especially for key equipment such as metal oxide arresters, monitor their aging status and replace them in time.

Sample only — not a preview of GB/T 32350.2-2015
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 28807.3-2025 in English

    GB/T 28807.3-2025 in English

    Railway applications—Compatibility between rolling stock and train detection systems—Part 3:Compatibility with axle counters

    2025-01-24
  • GB/T 42286.1-2022 in English

    GB/T 42286.1-2022 in English

    Electronic railway equipment—On board driving data recording—Part 1 : Technial specification

    2022-12-30
  • GB/T 32350.1-2025 in English

    GB/T 32350.1-2025 in English

    Railway applications—Insulation coordination—Part 1: Basic requirements—Clearances and creepage distances for all electrical and electronic equipment

    2025-12-31