GB/T 32576-2016 in English
VALIDGuide of calculating settings of auxiliary power relay protection for pumped storage power plant
- Issued on:2016-04-25
- Implemented on:2016-11-01
- File Format:PDF
- Delivery:Via email within 5 business days
$418.00
《GB/T 32576-2016抽水蓄能电站厂用电继电保护整定计算导则》由524(中国电力企业联合会)归口,主管部门为中国电力企业联合会。
Introduction
Interpretation of the core content of the standard
| Protection type | Key setting parameters | Sensitivity requirements | Typical action time limit |
|---|---|---|---|
| High voltage plant transformer longitudinal differential protection | Minimum action current (0.4-0.6) Ie Slope 15%-30% | ≥1.5 | Instantaneous |
| Low voltage plant transformer overcurrent protection | Self-starting coefficient Kst=5-7 Coordination coefficient 1.1-1.2 | ≥1.3 | 0.2-0.4s step difference |
| High voltage motor protection | Quick-break high value (6-8)Ie Low value (5-7)Ie | ≥2.0 | 0s/0.3s |
Key technical points
Short-circuit current calculation specification
The standard requires the use of GB/T 15544.1 and NB/T 35043 specifications:
- Ignore the resistance component and use the sub-transient reactance Xd" saturation value
- The equivalent electromotive force standard value is 1 and the phase is consistent
- When calculating the periodic component, the non-periodic component coefficient Kap(1.5-2.0) needs to be considered
Typical protection setting case
A 6300kVA transformer, the measured unbalanced current is 0.15Ie:
- Minimum operating current = 1.3×(0.03×2+0.05)×Ie=0.143Ie→take 0.5Ie
- Slope S=(2.5-0.5)/(10-0.8)=0.22
- Differential quick break take 7Ie
Analysis of Standard Evolution
This standard establishes a dedicated power supply protection system for pumped storage for the first time. The innovations include:
- Added special protection clauses for SFC transformers (Chapter 5.6)
- Clarified the calculation method of motor feedback current (Formula 36)
- Detailed the timing coordination of automatic switching of backup power supply (Article 5.7.3)
Implementation Suggestions
- New power stations should establish a setting calculation template according to Appendix A
- It is recommended to use the dynamic verification method to verify protection coordination
- Regularly test unbalanced current (Article 3.1 requirement)

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 9482-2005 in English
Agricultural machines implements and equipment- Dimensions for mechanical loading with bulk goods
2005-07-11 -

GB/T 26719-2022 in English
General rules for water statistics in water-use organization
2022-10-12 -

GB/T 2424.13-1981 in English
Electric and electronic products--Basic environmental test regulations for electricians--Guidelines for temperature variation tests
- -

GB/T 18257-2021 in English
Hot-face identification marking of refractory bricks for use in rotary kilns
2021-10-11 -

GB/T 29282-2024 in English
Glassine paper
2024-03-15 -

GB/T 36668.4-2020 in English
Condition monitoring and fault diagnostics of amusement device—Part 4:Vibration monitoring method
2020-03-06 -

GB/T 14392.3-2023 in English
Layout key for international trade documents—Part 3:Application guidelines
2023-12-28 -

GB 12694-2016 in English
Hygienic specifications of meat packing plant
2016-12-23 -

GB/T 38743-2020 in English
Vocabulary of waste/old wood and wood-based panels
2020-04-28 -

GB/T 38085-2019 in English
Technical specification of efficacy evaluation for degradation of aromatic amine pollutants by biological products
2019-10-18