Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
reversible pump-turbine regulating system introduction reversible pump-turbine regulating systems complete operation log system vane control operation mode includes operation specifications electro-hydraulic regulation system gbt32878 land test methods extended object mine hoist winder disc brakes
GB/T 32878-2016 in English

GB/T 32878-2016 in English

VALID

Code of operation for reversible pump-turbine regulating system

  • Issued on:2016-08-29
  • Implemented on:2017-03-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $310.00
$301.00
Standard No: GB/T 32878-2016
Document status: VALID
Title in English: Code of operation for reversible pump-turbine regulating system
Title in Chinese: 可逆式水泵水轮机调节系统运行规程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2016-08-29
Implemented on: 2017-03-01
ICS Classification: 27.140-Hydraulic energy engineering
Chinese Classification: F23-Power plant and electric power system operating maintenance
Professional Classification: GB-National Standard
Related Keywords: reversible pump-turbine regulating system introduction
reversible pump-turbine regulating systems
complete operation log system
vane control operation mode includes operation specifications
electro-hydraulic regulation system gbt32878
Related Topics: reversible water
System reverse flow
behavior regulation
GBT32878
GB/T 32878-2016
Motor Operation Regulations
Sewage pump is running but not draining water
Air conditioner replenishment water quality execution
Adjustment handwheel
Increase pump execution

《GB/T 32878-2016可逆式水泵水轮机调节系统运行规程》由524(中国电力企业联合会)归口,主管部门为中国电力企业联合会。


Introduction

1. Standard Overview

GB/T32878-2016 "Operational Specifications for Reversible Pump-Turbine Regulating Systems" is a standard formulated for the operation and management of reversible pump-turbine regulating systems, aiming to ensure the safe, stable and efficient operation of the equipment. This standard is applicable to all hydropower stations using reversible pump-turbine regulating systems.

2. Background of Standard Formulation

With the rapid development of pumped-storage power stations in my country, the demand for reversible pump-turbine regulating systems is increasing. This standard is formulated based on existing technological achievements and practical experience, aiming to unify and standardize industry operations, improve operating efficiency, and ensure the reliability of equipment under different working conditions.

3. Comparison of standard frameworks

Standard content GBT32878-2016 DL/T563-2013 Comparison results
Basic requirements Detailed provisions for the dynamic response and static characteristics of the regulation system Focus on the technical requirements of the turbine electro-hydraulic regulation system GBT32878 is more comprehensive, adding content such as asynchronous guide vane control
Operation mode Includes operation specifications for various working conditions such as power generation and pumping Does not cover the bidirectional regulation characteristics of reversible water pumps GBT32878 adds specific requirements for two-way regulation
Fault handling Develops detailed accident emergency procedures and handling principles Focuses on routine fault diagnosis GBT32878 emphasizes rapid response and system linkage

4. Implementation suggestions

4.1 Operation management suggestions

  • Establish a complete operation log system to regularly record equipment status and operating parameters.
  • Strengthen the inspection frequency, especially the inspection of newly commissioned or overhauled equipment.
  • Equip professional personnel to ensure that operators have the necessary qualifications and technical level.

4.2 Technical Upgrade Suggestions

  • Introduce intelligent monitoring system to realize remote monitoring and fault warning.
  • Optimize the adjustment parameter setting to improve the dynamic response speed of the system.
  • Regularly replace hydraulic components to ensure the reliability of mechanical components.

4.3 Safety Assurance Suggestions

  • Improve the emergency plan system and conduct accident drills regularly.
  • Strengthen the management of equipment spare parts to ensure the timely replacement of key components.
  • Establish an efficient communication mechanism with the power grid dispatch to deal with emergencies.

Sample only — not a preview of GB/T 32878-2016
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend