Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
project water water savings water intake water conservation water withdrawal water gel particle detectors bridge ca system certificate policies
GB/T 34148-2017 in English

GB/T 34148-2017 in English

VALID

Guide for calculation of water saved by projects

  • Issued on:2017-09-07
  • Implemented on:2018-04-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00
Standard No: GB/T 34148-2017
Document status: VALID
Title in English: Guide for calculation of water saved by projects
Title in Chinese: 项目节水量计算导则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2017-09-07
Implemented on: 2018-04-01
ICS Classification: 13.060.25-Water for industrial use
Chinese Classification: F04-Basic standards and general method
Professional Classification: GB-National Standard
Related Keywords: project water
water savings
water intake
water conservation
water withdrawal
Related Topics: save water
GB/T 34148-2017
ieee calculation guidelines
Calculations
GB/T+34148-2017
water standard
Water Calculation
microcomputing rules
Quantity calculation
42 water quality testing items
Flow Meter Item
Technical Guidelines for Project Water Conservation Assessment
Technical Guidelines for Project Water Conservation Assessment
Water quality 36 items
Moisture determination calculation
Section III item
tank water project
Quantum Computing Computing
item+quantity
Algorithm purpose
Technical Guidelines for Project Water Conservation Assessment
Purpose of the guideline
Measuring means
"Technical Guidelines for Project Water Conservation Assessment"
surface project budget
Moisture determination calculation
waste water project
GBT34148
GB/T 34148-2017
Calculation Rules 2013
PPP project settlement audit risks
RO effluent conductivity calculation
superconducting quantum computer
Target molecular weight content calculation method

《GB/T 34148-2017项目节水量计算导则》由TC442(全国节水标准化技术委员会)归口,主管部门为国家标准化管理委员会。


Introduction

GB/T 34148—2017 Standard Background and Importance

GB/T 34148—2017 "Guidelines for Calculating Water Savings in Projects" is one of the important national standards in the field of water conservation, which aims to standardize and guide the calculation of water saving in water-saving technology transformation projects. This standard was proposed by the Ministry of Water Resources and the National Development and Reform Commission, and is managed by the National Technical Committee for Water Conservation Standardization, and has important industry guidance significance.


Term Definitions and Core Concepts

Water saved by projects: refers to the reduction in water withdrawal per unit of water users compared to projects that have not implemented water-saving measures under the condition of meeting the same demand.

Baseline period: a period of time before the implementation of water-saving measures, used to compare and determine water savings.

Statistical reporting period: A period of time after the implementation of water-saving measures, used to compare and determine the amount of water saved.

Calculation method analysis

Basic formula and model method

The basic calculation formula for project water saving is: ΔWs = Wa - Wr, where ΔWs is the project water saving, Wa is the calibration water withdrawal, and Wr is the water withdrawal during the statistical reporting period.

The model method establishes a "water withdrawal-influencing factor" model, uses the base period data and the statistical reporting period data to calculate the calibration water withdrawal, and finally calculates the water saving. This method is suitable for projects with complete statistical data.

Direct comparison method

The direct comparison method measures the project water saving by comparing the difference in water withdrawal when the water-saving measures are turned on and off. This method is suitable for projects where water-saving equipment can be shut down, and is recommended for use when conditions permit.

Method name Applicable scenarios Calculation steps
Model method Projects with complete statistical data Establish a relationship model between water intake and influencing factors, and calculate the calibrated water intake and water saving
Direct comparison method Projects with water-saving devices that can be shut down Compare the water intake in the on and off states, and calculate the water saving

Comparative analysis of standard frameworks

The following is a comparative analysis of relevant domestic and foreign standards in water saving calculation:

Standard name Scope of application Core method Features
GB/T 34148—2017 Water-saving technology transformation project Model method, direct comparison method Comprehensive method, focus on data support
ISO 14046
Enterprise water resources management Life cycle assessment method International perspective, focus on the entire industry chain

Implementation suggestions and precautions

Implementation suggestions:

  • Clearly define the project boundaries to ensure that all water-using units, equipment, and systems affected by water-saving measures are included in the calculation scope.
  • Choose the appropriate method: For projects with complete statistical data, the model method is preferred; for projects where equipment can be shut down, the direct comparison method is preferred.
  • Pay attention to data quality: Ensure the accuracy and completeness of data in the base period and statistical reporting period.

Notes:

  • Avoid measuring time that is too short to avoid large deviations.
  • When setting the calibration water intake adjustment value, fully confirm with the relevant parties and ensure their independence.
  • Regularly review the calculation results to ensure the accuracy of water savings.

Sample only — not a preview of GB/T 34148-2017
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend