Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
main process/energy flow process flow power plant flow charts process diagrams coal-fired power plant power plants basic rack tooth reduction units appendix b plastics baths
GB/T 36290.1-2020 in English

GB/T 36290.1-2020 in English

VALID

Process diagrams for power plants—Part 1: Specification for diagrams

  • Issued on:2020-06-02
  • Implemented on:2020-12-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $490.00
$476.00
Standard No: GB/T 36290.1-2020
Document status: VALID
Title in English: Process diagrams for power plants—Part 1: Specification for diagrams
Title in Chinese: 电站流程图 第1部分:制图规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2020-06-02
Implemented on: 2020-12-01
ICS Classification: 01.100.01-Technical drawings in general
Chinese Classification: F10-Energy in general
Professional Classification: GB-National Standard
Related Keywords: main process/energy flow process flow
power plant flow charts
process diagrams
coal-fired power plant
power plants
Related Topics: flow chart analysis
power station
process
Streamline standard
Figure gb
flow graph collection
Analysis of flow chart
Flow cytometry analysis
flow diagram
flow chart analysis
current diagram
Stream graph partition q1
flow graph division
Draw flow diagram
flow graph classification
flow chart
Test flow chart
Process English
Cytometry + Analysis
GB/T 36290.1
GB/T 36290.1-2020
mapping
jc1 flow diagram
cfse flow chart
Enzyme identification flow chart
Flow chart production

《GB/T 36290.1-2020电站流程图 第1部分:制图规范》由TC376(全国电站过程监控及信息标准化技术委员会)归口,主管部门为中国电力企业联合会。


Introduction

Core content interpretation

Drawing typeAbbreviationApplication stageCore elements
Block diagramBLDConceptual designOverview of main process/energy flow
Process flow diagramPFDDetailed designEquipment configuration/control loop
Process and instrumentation diagramPIDConstruction and operationPipeline/instrument details

Technology evolution analysis

This standard is equivalent to the ISO14084-1:2015 international standard, and for the first time establishes a standard system for drawing power plant flow charts in my country:

  • Innovation: The PID diagram is defined as a process and instrumentation diagram, which is distinguished from the traditional piping and instrumentation diagram (P&ID)
  • Compatibility: It forms a hierarchical relationship with the ISO15519 series of standards and supplements special requirements in the power plant field

Implementation points

Typical application scenarios

In the steam-water system of a 600MW coal-fired power plant:

  1. The BLD diagram shows the energy flow of the boiler-turbine-condenser
  2. The PFD diagram annotates the control parameters of the feedwater pump (pressure 8.5MPa)
  3. PID diagram details pipeline grade/insulation requirements

Symbol representation specifications

Key requirements:

  • Flow arrow spacing ≤ 10 times line width
  • DN value must be marked at pipe diameter change
  • Redundant equipment marking such as 3×50%

Sample only — not a preview of GB/T 36290.1-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.