GB/T 36536-2018 in English
VALIDTest method of water balance in cement production enterprises
- Issued on:2018-07-13
- Implemented on:2019-02-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$214.00
《GB/T 36536-2018水泥生产企业水平衡测试方法》由TC442(全国节水标准化技术委员会)归口,主管部门为国家标准化管理委员会。
Introduction
1. Standard Overview
GB/T 36536-2018 "Water Balance Test Method for Cement Production Enterprises" is a water resource management standard formulated for the cement production industry. This standard specifies in detail the terminology, test methods and procedures for water balance tests in cement production enterprises, aiming to help enterprises optimize water management, improve water conservation effects, and provide technical support for the sustainable development of enterprises.
2. Background of Standard Formulation
With the rapid development of my country's economy, the cement industry, as an important pillar industry of the national economy, is facing the challenges of water shortage and increasing environmental pressure. In order to promote the sustainable development of the cement industry, the National Standardization Administration organized relevant units to formulate this standard to regulate the water management of cement production enterprises and improve the efficiency of water resource utilization.
3. Comparison of standard frameworks
| Standard dimensions | GB/T 36536—2018 | Comparison with international standards | Other domestic industry standards |
|---|---|---|---|
| Term definitions | Clearly defines the definition and related terms of water balance test. | Part of the terms are consistent with ISO 14046 (water footprint) standard. | Maintains consistency with other industrial industry standards. |
| Test scope | Covering the entire cement production process, including raw material processing, clinker burning and other major links. | Aligned with internationally accepted industrial water management standards. | It has reference value in other domestic industries such as chemical industry and steel industry. |
| Test method | The method combines water balance equation and measured data. | It is consistent with the internationally accepted water test method. | It has a leading position in domestic industrial water management. |
4. Implementation suggestions
4.1 Preparation before testing
The selection and calibration of test instruments are the key to ensure data accuracy. Enterprises should be equipped with water meters and flow meters that meet the accuracy level according to the requirements of GB/T 27886, and provide professional training for test personnel.
4.2 Technical points in the measurement phase
During the measurement process, it is recommended to use a combination of ultrasonic flowmeter and water meter, record data three times a day, and conduct error analysis. At the same time, draw a water flow chart to ensure that the layout of the test points is reasonable.
4.3 Data analysis and improvement measures
Based on the measured data, calculate key indicators such as water intake per ton of clinker and water intake per ton of cement, and compare them with the industry average. For the water waste problems found, propose targeted water-saving transformation plans, such as optimizing the cooling system or increasing the utilization rate of circulating water.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 42031-2022 in English
Drawing method of water balance diagram for water-use organization
2022-10-12