Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
energy conservation assessment coal mine coal preparation plant project coal preparation plant project energy measurement management coal preparation plant project introduction gb/t coal preparation plant projects power frequency characteristic parameters child care industry archives management rules entry requirements
GB/T 36715-2018 in English

GB/T 36715-2018 in English

VALID

General principles for energy conservation assessment—Coal mine and coal preparation plant project

  • Issued on:2018-09-17
  • Implemented on:2019-04-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00
Standard No: GB/T 36715-2018
Document status: VALID
Title in English: General principles for energy conservation assessment—Coal mine and coal preparation plant project
Title in Chinese: 节能评估技术导则 煤炭矿井及选煤厂项目
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2018-09-17
Implemented on: 2019-04-01
ICS Classification: 27.010-Energy and heat transfer engineering in general
Chinese Classification: F01-Technical management
Professional Classification: GB-National Standard
Related Keywords: energy conservation assessment coal mine
coal preparation plant project
coal preparation plant project energy measurement management
coal preparation plant project introduction gb/t
coal preparation plant projects
Related Topics: Coal mine energy saving
Technical Guidelines for Project Water Conservation Assessment
Technical Guidelines for Project Water Conservation Assessment
Coal to oil item
Technical Guidelines for Project Water Conservation Assessment
"Technical Guidelines for Energy Conservation Assessment for Combined Heat and Power Projects"
Purpose of the guideline
coal energy saving
"Technical Guidelines for Project Water Conservation Assessment"
Mine with one million tons of coal
Same coal high-quality mine
Energy Conservation Assessment Technical Guidelines for Wind Power Projects
Coal Mine Mapping
GBT36715
GB/T 36715-2018
coal preparation plant double
Coal Flotation Agent
General technology for intelligent coal preparation plant construction
General technology for intelligent coal preparation plant construction
Overburden Mine Assessment
Census technology for old coal empty areas
Dry coal preparation technology
Project technical performance
General technology for intelligent coal preparation plants
Energy-saving design of coal preparation plant
Coal project land
gb/t 36715

《GB/T 36715-2018节能评估技术导则 煤炭矿井及选煤厂项目》由TC20(全国能源基础与管理标准化技术委员会)归口,TC20SC3(全国能源基础与管理标准化技术委员会能源管理与节能评估分会)执行,主管部门为国家标准化管理委员会。


Introduction

GB/T 36715—2018 Technical Guidelines for Energy Conservation Assessment Coal Mine and Coal Preparation Plant Project Interpretation

Background and Significance of Standard Formulation

GB/T 36715—2018 Technical Guidelines for Energy Conservation Assessment Coal Mine and Coal Preparation Plant Project is an important standard for energy conservation management in my country's coal industry, aiming to standardize the energy conservation assessment work of coal mine and coal preparation plant projects and promote the efficient use and sustainable development of energy resources. With my country's emphasis on green and low-carbon development, the formulation of this standard provides important guidance for the advancement of energy-saving technologies in the coal industry.


Content and requirements of energy-saving assessment

Assessment dimensions Key requirements Implementation focus
Preliminary preparation Clear the scope of assessment, collect basic information, determine the basis for assessment, and conduct on-site investigation Ensure data accuracy and completeness to lay the foundation for subsequent analysis.
Process plan Analyze the energy-saving of the project process flow Optimization suggestions:Choose high-efficiency equipment and process paths to reduce energy consumption.
General layout Evaluate the impact of layout on energy saving Optimization suggestions:Rationally plan functional zoning and reduce material transportation distance.

Analysis of main energy-consuming systems and equipment

Mine hoists and ventilators are the main energy-consuming equipment in the mine, and their energy efficiency levels need to be evaluated against standards such as GB/T 29723. For equipment without clear energy efficiency standards (such as coal mining machines), it is recommended to use analogy analysis or expert judgment for evaluation.

Case Study: Optimization of a Mine Hoisting System

By replacing high-efficiency motors and frequency conversion control technology, the energy consumption of the hoisting system was reduced by 15%, saving about 500,000 yuan in annual costs.

Energy Management Plan and Implementation Suggestions

To ensure the effective implementation of energy-saving measures, it is recommended that:

  • Establish a sound energy management system and organization.
  • Equip with advanced energy metering instruments to ensure data accuracy.
  • Adopt an energy management system that complies with GB/T 23331 and other standards.

Comparison of Standard Framework and Analysis of Technology Evolution

Dimension GB/T 36715—2018 Comparison Standard (such as GB/T 29453)
Scope of Application Coal Mine and Coal Preparation Plant Project Energy Measurement Management of Coal Enterprises
Evaluation Method Energy Balance Analysis Method Energy Efficiency Benchmarking Method

Implementation Suggestions

In order to promote the effective implementation of the standard, the following suggestions are put forward:

  1. Strengthen the professional capacity building of energy-saving assessment institutions.
  2. Encourage enterprises to adopt advanced energy management technologies (such as intelligent monitoring systems).
  3. Carry out energy-saving training and experience exchange activities regularly.

Sample only — not a preview of GB/T 36715-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend