Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
energy construction monitoring system key indicators dimensions basic indicators energy efficiency indicators monitoring monitoring subsystem year-on-year air-conditioning system energy efficiency energy consumption reflective insulation coatings catalpa sialic acid content
GB/T 36674-2018 in English

GB/T 36674-2018 in English

VALID

General technical requirements for the energy construction monitoring system in public institutions

  • Issued on:2018-09-17
  • Implemented on:2019-04-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $550.00
$534.00
Standard No: GB/T 36674-2018
Document status: VALID
Title in English: General technical requirements for the energy construction monitoring system in public institutions
Title in Chinese: 公共机构能耗监控系统通用技术要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2018-09-17
Implemented on: 2019-04-01
ICS Classification: 27.010-Energy and heat transfer engineering in general
Chinese Classification: F01-Technical management
Professional Classification: GB-National Standard
Related Keywords: energy construction monitoring system
key indicators dimensions basic indicators energy efficiency indicators monitoring
monitoring subsystem
year-on-year air-conditioning system energy efficiency
energy consumption
Related Topics: surveillance system
energy consumption
Technical requirements for high-performance computer cluster monitoring system
Technical requirements for high-performance computer cluster monitoring system
Metric Machine Requirements
Handheld Energy Monitoring System
GBT36674
GB/T 36674-2018

《GB/T 36674-2018公共机构能耗监控系统通用技术要求》由TC20(全国能源基础与管理标准化技术委员会)归口,主管部门为国家标准化管理委员会。


Introduction

Analysis of the core framework of the standard

This standard constructs a three-level subsystem architecture: on-site measurement and monitoring subsystem, data acquisition subsystem and information management subsystem. Among them, the measurement instruments must meet the accuracy requirements of GB17167, and the data collector must support 32+ device access and have a storage capacity of 256MB.


Comparative analysis of key indicators

Dimensions Basic indicators Energy efficiency indicators
Monitoring objects 15 types of energy consumption 29 economic and technical indicators
Data collection 1min-1h adjustable cycle Sub-item measurement error ≤2%
Transmission security MD5/SHA encryption GB/T 22239 Level 3 protection

Typical Implementation Case

A provincial government agency used multi-function electricity meter + ultrasonic water meter to build a monitoring network and achieved data aggregation through the Modbus protocol. After the system is implemented:

  • Lighting electricity consumption decreased by 27% year-on-year
  • Air-conditioning system energy efficiency increased by 33%
  • Data collection completeness rate reached 99.92%

Technology evolution trend

The standard innovatively introduces the ISO/IEC/IEEE18880 ubiquitous green community protocol, supporting:

  1. Multi-protocol compatibility (Zigbee/6LowPAN/BLE)
  2. Tree-like control object model
  3. TRAP event-driven mechanism

Implementation suggestions

Phase 1:Complete the transformation of measuring instruments according to Clause 4.3.1, and the coverage rate of key energy-consuming equipment must reach 100%

Phase 2: Deploy data collectors according to Appendix B to ensure that electromagnetic compatibility complies with GB/T 17626 series requirements

Phase 3: Establish an energy-saving closed loop based on 8.2.7 energy control strategy, paying special attention to the management of special power consumption scenarios

Sample only — not a preview of GB/T 36674-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend