GB/T 37814-2019 in English
VALIDTechnical specification for remote power supply system in fully-mechanized mining and top coal caving mining face
- Issued on:2019-08-30
- Implemented on:2020-03-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$97.00
| Standard No: | GB/T 37814-2019 |
| Document status: | VALID |
| Title in English: | Technical specification for remote power supply system in fully-mechanized mining and top coal caving mining face |
| Title in Chinese: | 综采综放工作面远距离供电系统技术规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2019-08-30 |
| Implemented on: | 2020-03-01 |
| ICS Classification: | 73.100.01-Mining equipment in general |
| Chinese Classification: | D90-Mining machinery equipment in general |
| Professional Classification: | GB-National Standard |
| Related Keywords: | power supply system
remote power supply system long-distance power supply system long-distance power supply power supply requirements |
| Related Topics: | working surface
GBT37814 Objective working distance Design of conventional power supply system for fully mechanized mining and caving working face Remote charging and discharging technology |
《GB/T 37814-2019综采综放工作面远距离供电系统技术规范》由603(中国煤炭工业协会)归口,主管部门为中国煤炭工业协会。
Introduction
Interpretation of Technical Specifications for Long-distance Power Supply System of Fully Mechanized Coal Mining and Top-coal Caving Working Face
1. Background of Standard Formulation
With the continuous advancement of coal mining technology, fully mechanized coal mining and top-coal caving working faces occupy an important position in coal mine production. However, in actual operation, due to factors such as complex equipment layout, frequent movement and long power supply distance, traditional power supply methods are difficult to meet the needs of efficiency and safety. In order to solve these problems, GB/T 37814-2019 "Technical Specifications for Long-distance Power Supply System of Fully Mechanized Coal Mining and Top-coal Caving Working Face" came into being, aiming to provide coal mining enterprises with a scientific design basis for long-distance power supply systems.
2. Comparison of standard frameworks
| Chapter | Content Overview | Keywords |
|---|---|---|
| 1 Scope | Specifies the design requirements and applicable scope of the long-distance power supply system. | Design requirements, fully mechanized mining and caving, long-distance power supply |
| 4 General requirements | Details the general principles and power supply requirements of system design. | System design, power supply requirements, equipment selection |
| 6 Technical requirements for equipment selection | Specifies the technical parameters of mobile substations, combination switches and other equipment. | Mobile substation, combination switch, frequency converter |
3. Implementation suggestions
Case analysis:When a coal mine applied this standard, it significantly reduced the power loss of the power supply system by optimizing the location of distribution points and equipment selection. For example, the mobile substation was arranged in the widened area, and special frequency conversion cables were used to effectively reduce voltage losses.
Suggestions:Enterprises should focus on the following points during implementation:
- Fully consider the working face environmental conditions and reasonably select equipment;
- Optimize the power supply line design to ensure that the voltage loss is within the allowable range;
- Regularly maintain electrical equipment to ensure safe operation of the system.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 7679.4-2025 in English
Mining machinery terminology—Part 4:Mine hauling equipment
2025-05-30 -

GB/T 25706-2010 in English
Code of designations for mining machinery products
2010-12-23 -

GB/T 33921-2017 in English
Underground rubber-tyred mining machines--Performance requirements and test procedures for brake systems
2017-07-12 -

GB/T 37611-2019 in English
General specification for advance support system in fully-mechanized mining and top coal caving mining face
2019-08-30 -

GB/T 47112-2026 in English
Classification for intelligent operations of mobile mining machinery
2026-01-28 -

GB/T 7679.1-2023 in English
Mining machinery terminology—Part 1:Mining equipment
2023-09-07