Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
heat treatment process heat treatment heat treatment parameters heat treatment quality traceability system metal parts electronic order data ― mechanical strength introductionthis standard machine work rolls
GB/T 39247-2020 in English

GB/T 39247-2020 in English

VALID

Additive manufacturing—Specification for heat treatment process of metal parts

  • Issued on:2020-11-19
  • Implemented on:2021-06-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $150.00
$146.00

《GB/T 39247-2020增材制造 金属制件热处理工艺规范》由TC562(全国增材制造标准化技术委员会)归口,主管部门为中国机械工业联合会。


Introduction

Analysis of the core content of the standard

This standard systematically specifies the requirements for the entire process of heat treatment of additively manufactured metal parts for the first time, focusing on solving the technical problems of post-processing of parts formed by processes such as laser powder bed fusion and directed energy deposition.


Comparison of key technologies

Process type Typical materials Differences in key parameters Equipment requirements
PBF-LB/M TC4 titanium alloy Double annealing temperature700-760℃/900-970℃ Vacuum furnace or protective atmosphere furnace
DED-Arc/M 2219 aluminum alloy Solution transfer time≤20s Forced air cooling device
DED-EB/M GH4169 high temperature alloy Homogenization treatment 1070-1120℃ High vacuum furnace (≤10-3Pa)

Implementation points

Typical application case

A spacecraft TC11 titanium alloy bracket was manufactured using the PBF-LB/M process. According to Clause 6.6.2 of the standard, stress relief annealing at 530-580℃×4h was carried out within 8 hours after forming. The residual stress was reduced by 72% after detection.

Technological innovations

  • The first furnace sample concept (3.1.3), requiring process verification in the same batch
  • Specify special requirements for powder cleaning (6.1.1) to avoid sintering of powder in the inner cavity
  • Refine the heat treatment parameters of 22 alloys (Table 2), covering the three major categories of titanium/aluminum/high-temperature alloys

Quality control requirements

Establish a heat treatment quality traceability system in accordance with GB/T32541, with key control points including:

  1. Furnace temperature uniformity ≤±5℃ (5.2.3)
  2. Vacuum furnace pressure rise rate ≤0.67Pa/h (Table 1)
  3. Process archives are kept for ≥5 years (Chapter 8)

Sample only — not a preview of GB/T 39247-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.