Introduction
Analysis of the core framework of the standard
| Evaluation phase | Key indicators | Technical basis | Output requirements |
|---|---|---|---|
| Design evaluation | Detector coverage ≥80% | GB/T39173 | Safety integrity verification report |
| Pre-operation assessment | Safety availability ≥90% | GB/T21109 | FAT/SAT record |
| Functional review | Change compliance | HAZOP analysis | 5-year cycle report |
Key technical requirements
1. Detector deployment principles
When using flame detectors and gas detectors, the following should be followed:
- Geometric analysis method: Applicable to small equipment (LPG pump sets, etc.)
- Scenario simulation method: Applicable to large equipment (compressor plants, etc.)
Application case
When a natural gas station adopts 2ooN voting logic, the calculated safety availability of 8 flame detectors is 90%, which can be increased to 99.21% when switching to 1ooN logic (see Appendix B).
2. Safety Integrity Management
Control units must meet the following requirements:
| SIL level | PFDavg | Applicable scenarios |
|---|---|---|
| SIL1 | 10-2~10-1 | General risk area |
| SIL2 | 10-3~10-2 | High-risk device area |
Implementation recommendations
1. Optimization of the assessment process
- Establish a three-dimensional model pre-assessment mechanism (Clause 6.1.2)
- Use fault tree analysis (FTA) to verify the common cause failure factor β value
- Regularly update the equipment failure rate database (Table B.1)
2. Document management specifications
The following should be kept in full:
- Change impact analysis report (Clause 7.1.2)
- Fire protection system acceptance documents (Appendix C)
- MTTR measurement records (Table B.2)
3. Personnel capacity building
Assessment team members should have:
- Qualification of functional safety engineer (CFSP)
- HAZOP analysis experience
- At least 3 yearsSafety Instrument SystemOperation and Maintenance Experience

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 32235.2-2024 in English
Industrial process measurement, control and automation—Digital factory framework—Part 2: Model elements
2024-08-23 -

GB/T 20171-2006 in English
EPA system architecture and communication specification for use in industrial control and measurement systems
2006-05-08 -

GB/Z 21099.6-2018 in English
Function blocks(FB) for process control and electronic device description language(EDDL)—Part 6:Meeting the requirements for integrating fieldbus devices in engineering tools for field devices
2018-06-07 -

GB/T 29618.1-2017 in English
Field device tool(FDT) interface specification—Part 1:Overview and guidance
2017-07-31 -

GB/Z 29496.1-2013 in English
Control & communication network CC-Link Safety specification―Part 1:Overview/Protocol
2013-07-19 -

GB/T 47014.3-2026 in English
Industrial communication networks—Fieldbus specifications—Type 2 elements: EtherNet/IP,ControlNet and DeviceNet specifications—Part 3: Applicatoin layer service definition
2026-01-28 -

GB/T 31230.3-2014 in English
Industrial ethernet fieldbus EtherCAT―Part 3:Data Link Layer service definition
2014-09-30 -

GB/T 30976.1-2014 in English
Industrial control system security―Part 1:Assessment specification
2014-07-24