《GB/T 41303-2022塔式太阳能热发电站吸热器技术要求》由TC565(全国太阳能光热发电标准化技术委员会)归口,主管部门为中国电力企业联合会。
Introduction
Interpretation of the core content of the standard
GB/T41303-2022 systematically standardizes the technical system of the absorber of tower solar thermal power stations for the first time, and puts forward differentiated requirements for the two mainstream technical routes: molten salt absorber and water/steam absorber.
Comparison of key technical indicators
| Parameters | Molten salt absorber | Water/steam absorber |
|---|---|---|
| Load adjustment range | 20%-110% | 30%-110% |
| Thermal efficiency (standard operating conditions) | ≥85% | ≥85% |
| Allowable radiation energy flux density | ≥1000kW/m² | ≥750kW/m² |
Innovative Technical Specifications
The standard innovatively proposes the control requirements for tube screen size deviation (Appendix B), stipulating that the tube screen length deviation must be controlled within the range of ±4mm~±8mm to ensure the optical matching accuracy of large-scale concentrating systems.
Typical application case: After a 50MW solar thermal power station in Qinghai adopted this standard, the first-time qualified rate of absorber tube screen installation increased to 98%, and the annual power generation increased by 7%.
Implementation Suggestions
- New projects should give priority to the use of MS/E series molten salt external heat absorbers, whose 565℃ operating temperature is more compatible with the current heat storage system
- Pre-delivery stiffness test and on-site power test should be carried out strictly in accordance with the requirements of Table 5
- The reflectivity of the absorption coating needs to be tested every 2 years to maintain an absorption rate of ≥95%
目录
前 言
1 范围
2 规范性引用文件
3 术语和定义
4 分类与型号
5 总体要求
6 使用条件
7 外观、尺寸与结构要求
8 功能和性能要求
9 检测项目
10 包装与储运
11 文件

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 34933-2017 in English
Technical code for combiner box test of photovoltaic power station
2017-11-01 -

GB/T 40821-2021 in English
Test specification for heat exchange system of solar thermal power plant
2021-10-11 -

GB/T 40517-2021 in English
Solar thermal storage system for low and medium temperature application
2021-08-20 -

GB/T 41308-2022 in English
Guide for evaluating thermal energy storage system performance of solar power plant
2022-03-09