GB/T 41996-2022 in English
VALIDGuide of operation management model for the digital workshop of switchgear
- Issued on:2022-10-12
- Implemented on:2023-05-01
- File Format:PDF
- Delivery:Via email within 5 business days
$534.00
| Standard No: | GB/T 41996-2022 |
| Document status: | VALID |
| Title in English: | Guide of operation management model for the digital workshop of switchgear |
| Title in Chinese: | 开关设备数字化车间运行管理模型指南 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2022-10-12 |
| Implemented on: | 2023-05-01 |
| Chinese Classification: | K43-High voltage switchgear |
| Professional Classification: | GB-National Standard |
| Related Topics: | Digitizing
workshop equipment running time equipment running time Operation management Instant workshop equipment Operation management Equipment operating parameters Equipment operating parameters equipment availability equipment running time Device switch Device switch time "Digitizing Device switch device index Digital workshop GB/T 41996 GB/T 41996-2022 Flue gas online equipment start-up preparation Equipment operation rate Device power-on time Equipment standard operating time Space ring mold equipment |
《GB/T 41996-2022开关设备数字化车间运行管理模型指南》由TC65(全国高压开关设备标准化技术委员会)归口,主管部门为中国电器工业协会。
Introduction
Analysis of Standard Core Framework
| Core model | Driving data | Output results | Key technical indicators |
|---|---|---|---|
| Production planning and scheduling | Production order+Product BOM+Process data | Assembly operation plan+Material requirement planning | MRP algorithm accuracy ≥98% |
| Production line operation | Assembly operation plan+MBOM | Completion information+Production feedback | Beat compliance rate ≥95% |
| Material distribution | Material Requirements Planning | Distribution Feedback Information | AGV Path Optimization Rate ≥ 90% |
Key Technology Implementation Path
1. Production Planning and Scheduling Model
Based on MRP Algorithm:
- Gross Demand Calculation: Remaining Order Quantity × BOM Level Expansion
- Net Demand Formula: [Gross Demand/(1-Loss Rate)-Existing Inventory+Safety Stock]
- Four Ordering Strategies: Batch-to-Batch/Fixed Batch/Reorder Point/Period Ordering
2. Production Line Operation Control
Using Beat Control Model:
| Abnormal type | Solution |
| Abnormal type | Solution |
| Planning and Scheduling Conflicts | Enable Equipment Maintenance Plan Priority Algorithm |
| AGV Path Blockage | Dynamically Adjust the vij Parameter in Formula (2) |

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 11022-2020 in English
Common specifications for high-voltage alternating-current switchgear and controlgear standards
2020-12-14 -

GB/T 7674-2020 in English
Gas-insulated metal-enclosed switchgear for rated voltages of 72.5 kV and above
2020-11-19 -

GB/T 25091-2010 in English
High-voltage direct-current disconnectors and earthing switches
2010-09-02 -

GB/T 3906-2020 in English
Alternating-current metal-enclosed switchgear and controlgear for rated voltages above 3.6 kV and up to and including 40.5 kV
2020-03-31 -

GB/T 8905-2012 in English
The guide for management and measuring SF6 gas in electrical equipment
2012-11-05 -

GB/T 30092-2013 in English
Metal bellows compensator used in high voltage combined electrical appliance
2013-12-17 -

GB/T 42009-2022 in English
High voltage alternating-current circuit-breakers for filter banks
2022-10-12 -

GB/T 3804-2017 in English
High-voltage alternating current switches for rated voltage above 3.6 kV and less than 40.5 kV
2017-09-29 -

GB/T 14810-2014 in English
Alternating Current Switches for Rated Voltages of 72.5 kV and Above
2014-05-06 -

GB/T 22381-2017 in English
Cable connections between gas-insulated metal-enclosed switchgear for rated voltages equal to and above 72.5 kV and fluid-filled and extruded insulation power cables--Fluid-filled and dry type cable-terminations
2017-07-12