Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
control smart chemical park construction framework chemical industry park introduction interpretation key technical requirements dimensions traditional park requirements chemical parks expanded chemical parks joint cutt real-time perception data synoptophores
GB/T 42078-2022 in English

GB/T 42078-2022 in English

VALID

Guidelines for the development and construction of chemical industry park

  • Issued on:2022-12-30
  • Implemented on:2022-12-30
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $610.00
$592.00

《GB/T 42078-2022化工园区开发建设导则》由TC251(全国危险化学品管理标准化技术委员会)归口,主管部门为国家标准委。


Introduction

Interpretation of the core content of the standard

GB/T42078-2022, as a national guiding standard for the development and construction of chemical parks, has established four basic principles of "planning guidance, safety priority, green and low-carbon, and smart collaboration". The standard applies to the full life cycle management of new and expanded chemical parks, and contains 8 chapters of main content and 5 normative appendices.


Comparison of key technical requirements

Dimensions Traditional park requirements Upgrade requirements of this standard
Safety protection distance Only consider fire protection distance Add domino effect analysis and QRA quantitative risk assessment
Intelligent management Independent subsystem construction Requirement to achieve interconnection of 9 major systems (including safe production, environmental monitoring, etc.)
Carbon emission management No clear requirements New carbon accounting system and dual carbon work plan

Key points for the implementation of key clauses

1. Site selection planning

  • Clearly define 9 types of prohibited site selection areas (such as earthquake fault zones, ecological red line areas, etc.)
  • Require the preparation of a 3D digital twin model for spatial simulation
  • Logistics and transportation channel width ≥16 meters (extra-large parks)

2. Safety emergency

  • Fire station response time ≤5 minutes
  • Mandatory configuration of gas defense stations and medical rescue stations
  • Establish a three-level emergency material reserve system

3. Environmental protection

  • Wastewater treatment implements the "one enterprise, one management, one monitoring" model
  • VOCs emissions require a supporting LDAR detection system
  • Soil pollution prevention and control implements zoning control

Smart Chemical Park Construction Framework

The standard innovatively proposes a "1+3+N" smart architecture:

  1. 1 data hub: integrates 9 types of data such as production safety and environmental monitoring
  2. 3 major support platforms: Internet of Things platform, GIS platform, emergency command platform
  3. N application scenarios: including full-process traceability of hazardous chemicals, AI video inspection, etc.

Network security is required to meet the Level 3 Security Protection Level or above standards.


Implementation Suggestions

For park managers

  • Establish a three-dimensional evaluation model for project access (economic/safety/environmental protection dimensions)
  • Promote the digital monitoring system for public pipeline corridors
  • Build a supporting training base that combines virtual and real elements

For corporate investors

  • Carry out reaction safety risk assessment in advance (mandatory requirement for fine chemical projects)
  • Automation control rate of process equipment ≥ 85%
  • Participate in the construction of the park's carbon trading mechanism

Sample only — not a preview of GB/T 42078-2022
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.