GB/T 42529-2023 in English
VALIDEvaluation requirements for moisture conduction and phase change respiratory function of new wall materials
- Issued on:2023-05-23
- Implemented on:2023-12-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$156.00
《GB/T 42529-2023新型墙体材料湿传导及相变呼吸功能的评价要求》由TC285(全国墙体屋面及道路用建筑材料标准化技术委员会)归口,主管部门为中国建筑材料联合会。
Introduction
1. Background of standard formulation and technological evolution
With the continuous improvement of building energy conservation and environmental protection requirements, new wall materials play an increasingly important role in regulating indoor temperature and humidity. The GB/T 42529-2023 standard aims to provide a scientific basis for evaluating the moisture conduction and phase change breathing functions of such materials to ensure that their performance in practical applications meets the standards.
2. Comparison of standard frameworks
| Test mode category | Phase change breathing volume | Phase change breathing rate | ||
|---|---|---|---|---|
| Evaluation index | Evaluation result | Evaluation index | Evaluation result | |
| General mode | max <0.5% | Phase change breathing volume Class I material | tmax<2 h | Fast phase change breathing material |
| 0.5%≤△max<5% | Phase change breathing capacity Class II materials | 2h≤tmax<10 h | Medium speed phase change breathing materials | |
| △max≥5% | Phase change breathing capacity Class III materials | t max≥10 h | Slow phase change breathing materials | |
| Comfort mode | pmax<0.1% | Phase change breathing capacity Class I materials | tmax<1 h | Fast phase change breathing materials |
| 0.1%≤△max<1% | Phase change breathing capacity Class II materials | 1 h≤tmax<5 h | Medium-speed phase change breathing material | |
| △max≥1% | Phase change breathing volume Class III material | tmax≥5 h | Slow phase change breathing material | |
3. Implementation suggestions
In actual applications, it is recommended to:
- Material research and development:Focus on improving the phase change breathing rate of the material and optimizing its performance in different environments.
- Production process:Strictly follow the standard requirements for sample preparation and sensor installation to ensure the accuracy of test data.
- Application promotion:Choose new wall materials suitable for local conditions in combination with climate zoning to maximize its energy-saving effect.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 2542-2012 in English
Test methods for wall bricks
2012-12-31 -

GB/T 5101-2017 in English
Fired common bricks
2017-12-29 -

GB/T 32982-2016 in English
Fired decorative brick
2016-08-29