Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
animal excreta treatment facilities introduction sewage treatment facilities centralized rural human management specification construction acceptance high-voltage ceramic wall bushings dimensions low temperature cycle tests equipment maintenance procedures
GB/T 43829-2024 in English

GB/T 43829-2024 in English

VALID

Construction and management specification for centralized rural human and animal excreta treatment facilities

  • Issued on:2024-03-15
  • Implemented on:2024-10-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $220.00
$214.00
Standard No: GB/T 43829-2024
Document status: VALID
Title in English: Construction and management specification for centralized rural human and animal excreta treatment facilities
Title in Chinese: 农村粪污集中处理设施建设与管理规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2024-03-15
Implemented on: 2024-10-01
ICS Classification: 13.020.40-Pollution, pollution control and conservation
Chinese Classification: Z05-Specifications for pollution control
Professional Classification: GB-National Standard
Related Keywords: animal excreta treatment facilities introduction
sewage treatment facilities
centralized rural human
management specification
construction acceptance
Related Topics: Facilities construction
processing facility
Rural Sewage Treatment Dilemma
Guidelines for Rural Domestic Sewage Treatment
Principles of Zhongtai Construction
Tianrui rural sewage treatment
Water facilities data collection and management
Ammonia test method for manure treatment center

《GB/T 43829-2024农村粪污集中处理设施建设与管理规范》由326(农业农村部)归口,主管部门为农业农村部。


Introduction

1. Background and significance of standard formulation

With the rapid economic development and enhanced environmental awareness in rural areas of my country, the issue of rural manure and sewage treatment has received increasing attention. The formulation of GB/T 43829-2024 standard aims to standardize the construction and management of centralized manure and sewage treatment facilities in rural areas, promote resource utilization, reduce environmental pollution, and achieve sustainable development.

2. Comparison of standard frameworks

Standard dimensions GB/T 43829-2024 requirements Comparative analysis
Scope of application Construction, reconstruction, expansion and management of centralized manure and sewage treatment facilities for humans and animals in rural areas at or above the village level. Compared with the old standard, the scope of application has been expanded and large-scale treatment has been emphasized.
Technical requirements Includes specific provisions on site selection and layout, process and facilities and equipment, construction and acceptance, etc. Added chapters on environmental protection, energy conservation and occupational safety to reflect comprehensiveness.
Resource utilization Encourage resource utilization of feces and sewage through aerobic composting, biogas fermentation, etc. In line with international advanced standards, emphasize the concept of circular economy.

3. Implementation suggestions

Site selection and layout:Give priority to areas with convenient transportation and complete infrastructure, and ensure that they are away from water source protection areas and disaster-prone areas.

Process selection: According to the actual local conditions, aerobic composting or biogas fermentation technology is preferred, combined with three-compartment septic tank and other equipment to achieve efficient treatment.

Construction and management: Engineering design and construction acceptance are carried out strictly in accordance with standard requirements, and a sound operation and management system is established to ensure the long-term and stable operation of the facilities.

Sample only — not a preview of GB/T 43829-2024
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend