Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
standard revision construction standard letter [ installation requirements quality acceptance content installation specificationschapter gasoline vehicle exhaust mandatory technical training mopeds scopethis standard specifies motorcycle
GB/T 50551-2018 in English

GB/T 50551-2018 in English

VALID

Standard for installation and quality acceptance of palletizing mechanical engineering

  • Issued on:2018-03-16
  • Implemented on:2018-11-01
  • File Format:PDF
  • Delivery:Via email within 10 business days
Price(USD): $1,320.00
$1,281.00
Standard No: GB/T 50551-2018
Document status: VALID
Title in English: Standard for installation and quality acceptance of palletizing mechanical engineering
Title in Chinese: 球团机械设备工程安装及质量验收标准
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 10 business days
Issued on: 2018-03-16
Implemented on: 2018-11-01
Superseding: GB 50551-2010 Code for quality acceptance of palletizing mechanical equipment installation engineering
Professional Classification: GB-National Standard
Related Keywords: standard revision
construction standard letter [
installation requirements
quality acceptance
content installation specificationschapter
Related Topics: Equipment
Mechanical reference material
Equipment acceptance criteria and methods
Quality acceptance criteria
Equipment reference material
pellets
Fluid Machinery and Engineering
How to check and accept the measuring equipment
Quality acceptance
Acceptance of machinery and equipment
Equipment acceptance machinery
Mechanical experiment equipment
Quality acceptance
Mineral processing machinery and equipment engineering installation acceptance
GBT50551
GB/T 50551-2018
gb50231-2017 mechanical equipment installation and construction acceptance
Construction Machinery Standard Network
The latest acceptance standards for washing equipment installation projects
"General Specifications for Construction and Acceptance of Mechanical Equipment Installation Projects" GB 50231
The latest construction quality acceptance standards for chemical equipment installation projects
General installation project quality acceptance specifications
Installation acceptance of skid-mounted equipment
Installation and acceptance of kettle equipment
Mechanical and electrical equipment manufacturing, installation, commissioning and acceptance
Mining mechanical and electrical equipment engineering installation and acceptance
Industrial equipment installation and hoisting acceptance
Loading and unloading machinery quality
Tower equipment installation and acceptance
Mining electromechanical equipment engineering installation and acceptance
Standardized acceptance of cabinet rooms
Group installation and construction organization standards
General engineering implementation and acceptance of mechanical equipment installation projects
Pellet quality
What are the construction methods for installing non-standard mechanical equipment?
Construction machinery and equipment quality
Chemical engineering equipment installation quality acceptance
Acceptance standards and methods for robots
Standard process for acceptance of automation equipment
Mechanical seal quality acceptance
Flowmeter installation acceptance
Repair and acceptance of tooling equipment
Measuring equipment acceptance content and
Machinery industry standardization and quality


Introduction

Background of Standard Revision and Technological Evolution

This standard was revised in accordance with the requirements of the Ministry of Housing and Urban-Rural Development's Construction Standard Letter [2015] No. 274, and was led by the China Metallurgical Construction Association and participated in by six units including the 17th Metallurgical Group. Compared with the previous version, the main enhancements are:

Revision highlightsNew contentDeleted content
Installation specificationsChapter 3.4.6-11 Equipment installation requirementsSwing-type tail wheel deviation regulations
Safety and Environmental ProtectionNew Chapter 13-

Key points for installation of core equipment

1. Powerful mixer

Horizontal mixerThe horizontality of the bearing seat is ≤0.1/1000, and the axial play clearance of the main shaft must meet the design value. When using the mortar installation method, the concrete strength must reach 75% of the foundation design value before fine adjustment.

2. Disc ball making machine

Special processes need to be formulated for the welding of loose parts, and the lining rubber bonding needs to be constructed according to special processes. Key indicators:

  • Disk flatness ≤10mm
  • Relative difference in edge height ≤5mm
  • Scraper verticality ≤0.5mm/m

Quality acceptance system

Three-level acceptance procedure

LevelAcceptance subjectDetection tools
Sub-projectSupervision + Construction UnitLaser collimator, feeler gauge
Sub-projectChief Supervision EngineerHydraulic pressure test equipment
Unit projectConstruction unitVibration analyzer

Key control points: High-strength bolt torque value, sealing slide expansion gap, flexible transmission gear meshing spot


Innovative technical terms

1. The Chain grate conveyor-rotary kiln system adopts laser centering technology, and the radial runout of the cylinder is ≤12mm

2. Installation requirements of the new flexible transmission device:

  • The tension ring bolts need to be degreased
  • When multiple sets of tension rings are tightened synchronously, the spacing difference is ≤0.05mm

Sample only — not a preview of GB/T 50551-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend