GB/T 50571-2010 in English
VALIDThe code for construction of offshore wind power project
- Issued on:2010-05-31
- Implemented on:2010-12-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$340.00
1 General Provisions
1.0.1 This code is formulated to improve the construction technology and management level for offshore wind power project, standardize the offshore wind power project construction and ensure the construction quality and safety.
1.0.2 This code is applicable to the newly-built, renovated and extended offshore wind power project construction.
1.0.3 The construction of offshore wind power project shall not only comply with the requirements stipulated in this code, but also shall meet those in the relevant current ones of the nation.
2 Terms
2.0.1 Offshore wind power project
The wind power project established at sea.
2.0.2 Gravity foundation
The foundation type to balance horizontal force and vertical force generated by the superstructure of wind turbine generator system and wave and tidal current by the gravity itself.
2.0.3 Pile foundation
Foundation type composed of foundation pile and superstructure bearing platform.
2.0.4 Tugging navigation
The transport mode to tug the offshore self-elevating platform, floating dock and non-powered barge with the tugboat, saddle and fixing device.
2.0.5 Assemblage field
The field at the land, wharf or dock to assemble the unit equipment.
2.0.6 Steel tubular jacket
The space steel frame formed by welding the circular steel pipes together and used as the guiding device and transverse support in the piling operation.
2.0.7 Offshore transformer
The offshore equipment to convert the voltage.
2.0.8 Marine positioning
The process to determine offshore position of ocean structure.
2.0.9 Pile driving test
The pile sinking test operation carried out prior to formal pile sinking to determine construction process of pile sinking, inspect bearing capacity of pile and verify whether geological conditions are consistent with the drawing.
2.0.10 Riprap mound
The mound riprapped with the block stone and then levelled.
2.0.11 Leading marks
The fixed vision navigation mark located on a position line formed by two or more marks at the same vertical surface.
2.0.12 Cathodic protection
The equipments to alleviate metal structures corrosion in corrosive medium by making the protected metal surface in the electrolyte cathodic through the external measures like sacrificial anode or impressed current.
2.0.13 Installation with part by part
The installation of tower, cabin, wind rotor or hub, blade sub-components in order after the equipment of the wind turbine generator system has been assembled part by part and transported to the preset position.
2.0.14 Installation of assembled parts
The installation of assembled wind turbine generator system (tower, cabin, wind rotor) by the offshore hoisting equipment.
Contents
1 General Provisions
2 Terms
3 Construction Preparation
3.1 General Requirements
3.2 Construction Survey
3.3 Construction Planning
4 Construction Transportation
4.1 General Requirements
4.2 Construction Traffic
4.3 Structure, Materials and Equipment Transportation
5 Construction of Foundation Works
5.1 General Requirements
5.2 Gravity Foundation
5.3 Pile Foundation
5.4 Foundation of Offshore Transformer
6 Installation of Wind Power Equipment
6.1 General Requirements
6.2 Installation of Wind Turbine Generator System
6.3 Installation of Offshore Transformer
6.4 Electrical Erection
6.5 Erection of Corollary Facilities
7 Laying-out of Submarine Cable
7.1 General Requirements
7.2 Cabling
8 Observation and Inspection
9 Testing and Trial Run of Wind Farm
9.1 General Requirements
9.2 Testing of Wind Turbine Generator System
9.3 Trial Run of Wind Turbine Generator System
9.4 Testing of Transformer
10 Construction Management
10.1 General Requirements
10.2 Safety Management
10.3 Quality Management
10.4 Environmental Management
Explanation of Wording in This Code
List of Quoted Standards

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/Z 29014.1-2024 in English
Cutting tool data representation and exchange—Part 1: Overview, fundamental principles and general information model
2024-03-15 -

GB/T 20042.6-2024 in English
Proton exchange membrane fuel cell—Part 6:Test method of bipolar plate properties
2024-03-15 -

GB/T 20085-2024 in English
Equipment for crop protection—Vocabulary
2024-05-28 -

GB 18671-2009/XG1-2023 in English
Intravenous needles for single use, includes Amendment 1
2023-05-23 -

GB/T 38493-2020 in English
Sensory analysis—Assessment (determination and verification) of the shelf life of foodstuffs
2020-03-06 -

GB 16715.4-2010 in English
Seed of gourd and vegetable crops—Part 4:Cole
2011-01-14 -

GB/T 39019-2020 in English
Custom furniture—Technical requirements for composite assembly identification
2020-07-21 -

GB/T 20144-2016 in English
Barrel thread for lampholders with shade holder ring
2016-04-25 -

GB 39220-2020 in English
Limits and monitor ing methods of total electric field of DC transmi ssion project
2020-05-20 -

GB 11174-1989 in English
Liquefied petroleum gases
-