Introduction
Analysis of the core content of the standard
Compilation grading system
The standard establishes a three-level compilation system: overall construction organization design of a single project → construction organization design of a unit project → technical measures for sections/sub-projects. Special projects need to be compiled separately:
- Special demonstration is required for vertical/inclined shafts with a depth exceeding 500m
- Additional support schemes are required for surrounding rock of Class IV and above
Dynamic management mechanism
The construction organization design needs to be dynamically updated in five stages:
| Stage | Update trigger conditions | Approval requirements |
|---|---|---|
| Changes in geological conditions | Difference in surrounding rock grade ≥1 level | Re-approval by chief engineer |
| Design changes | Increase or decrease in engineering volume exceeding 15% | Confirmation by supervisor |
| Process adjustment | Core equipment replacement | Expert demonstration |
Key technical requirements
Shaft and tunnel excavation and masonry engineering
Differentiated construction parameters are specified for different shaft types:
- Vertical shaft: mechanization matching rate ≥80%
- Inclined shaft: slag discharge efficiency ≥30m³/h
- Large chamber: smooth blasting residual hole rate ≥65%
Key points of installation project control
The installation of key equipment must meet the following requirements:
| System type | Detection index | Allowance deviation |
|---|---|---|
| Lifting system | Spindle horizontality | ≤0.1mm/m |
| Derrick installation | Verticality | ≤H/1500 |
| Track system | Track gauge | ±5mm |
Implementation suggestions
Digital application
Recommended:
- BIM technology for shaft collision detection
- 4D simulation system for construction progress
- Internet of Things equipment monitoring platform
Response to special working conditions
Suggestions for plateau mines:
- Equipment selection increases power reserve by 20%
- Staff shift cycle shortened by 30%
- Configure mobile oxygen production station
Standard evolution analysis
Main improvements compared to the 2008 version:
- New green construction technical requirements
- Strengthen dynamic management requirements
- Detailed installation project acceptance standards

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 7828-1987 in English
Reliability design reviews
1987-06-03 -

GB/T 15055-2021 in English
Permissible stamping variations in dimensions without tolerance indication
2021-10-11 -

GB/T 26027-2024 in English
High damage tolerance aluminium alloy profiles
2024-04-25 -

GB/T 30117.1-2024 in English
Photobiological safety of non-coherent light products—Part 1: General requirements
2024-04-25 -

GB/T 16429-1996 in English
Determination of the minimum ignition temperature of dust cloud
1996-06-04 -

GB/T 17489-2022 in English
Hydraulic fluid power—Particulate contamination analysis—Extraction of fluid samples from lines of an operating system
2022-10-12 -

GB/T 29165.2-2022 in English
Petroleum and natural gas industries—Glass-reinforced plastics (GRP) piping—Part 2: Qualification and manufacture
2022-12-30 -

GB/T 4857.20-1992 in English
Packaging--Transport packages--Bump test method
1992-02-03 -

GB/T 10716-1989 in English
Synchronous belt--Test method for tensile properties
1989-03-06 -

GB/T 50823-2013 in English
Code for Computer Control System Design of Oil/Gas Fields and Pipeline
2012-12-25