GB/T 5770-2020 in English
VALIDJerk fuel injection pump for diesel engine—Specifications
- Issued on:2020-04-28
- Implemented on:2020-11-01
- File Format:PDF
- Delivery:Within 1 day
$171.00
《GB/T 5770-2020柴油机柱塞式喷油泵总成 技术条件》由TC396(全国燃料喷射系统标准化技术委员会)归口,主管部门为中国机械工业联合会。
Introduction
Analysis of the core content of the standard
| Technical parameters | Requirements of the 2008 version | Changes to the 2020 version |
|---|---|---|
| Terminology specification | Rated operating conditions/speed | Rated operating conditions/speed |
| Pump end pressure | Recommended value of National II/III emission pressure | Cancel specific values and implement according to design values |
| Hydraulic timing correction plunger | Implemented according to enterprise agreement | Newly added requirements in accordance with JB/T12043 standard |
Detailed explanation of key technical requirements
3.4 Oil supply pre-stroke control
The pre-stroke limit deviation of the reference cylinder needs to be detected by a special measuring device. For the hydraulic timing correction plunger, special attention should be paid: The pull rod must be in the maximum stroke position to ensure that the plunger sleeve is completely separated from the oil return hole and the top clearance groove.
3.8 Oil supply characteristics
Newly added speed requirements for the speed regulator to take effect. The average oil supply deviation rate of each cylinder under rated conditions is ≤±3%. The calculation formula is: γ=(Q-Qc)/Qc×100%, where Qc is the designed oil supply.
3.12 Maximum pump end pressure
The original recommended value of 100/120MPa corresponding to National II/III emissions has been cancelled and changed to a value that must not exceed the design allowable value of the injection pump, which is more in line with actual engineering needs.
Test method upgrade
- 4.1.5: Added pressure tester accuracy requirements (0-200MPa, error ≤±3%)
- 4.2.7/4.2.8: Added injection start point and pump end pressure measurement items
- Sealing test: High pressure chamber detection pressure increased to 0.5MPa (O-ring seal is 0.4MPa)
Implementation suggestions
- Manufacturers should update the test bench pressure sensor range to 200MPa
- For hydraulic timing correction plunger products, the JB/T12043 standard must be implemented simultaneously
- It is recommended to establish a pump end pressure design value database to replace the corresponding value of the original emission standard

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB 3539-1983 in English
Basic types and technical specifications of fuel injection tubing connections for diesel engine
- -

GB/T 25366-2022 in English
Electronic control common rail system for diesel engines—The rail
2022-07-11 -

GB 5769-1986 in English
Technical specification for fuel injector assemblies of diesel engines
-