Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
sequential sampling procedures inspection scheme inspection plan sampling plan sampling plan system bed boilers introduction standard background ac peak voltmeters introductionthis standard ≤10-4 pa·m3/s test principle leak detection
GB/T 8051-2002 in English

GB/T 8051-2002 in English

SUPERSEDED

Sequential sampling procedures and tables for inspection by attributes

  • Issued on:2002-06-13
  • Implemented on:2003-01-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $600.00
$582.00
Standard No: GB/T 8051-2002
Document status: SUPERSEDED
Superseded by: GB/T 8051-2008 Sequential sampling plans for inspection by attributes
Superseded on: 2009-01-01
Title in English: Sequential sampling procedures and tables for inspection by attributes
Title in Chinese: 计数序贯抽样检验程序及表
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2002-06-13
Implemented on: 2003-01-01
ICS Classification: 03.120.30-Application of statistical methods
Chinese Classification: A41-Mathematics
Professional Classification: GB-National Standard
Related Keywords: sequential sampling procedures
inspection scheme
inspection plan
sampling plan
sampling plan system
Related Topics: sampling inspection
Personal sampling inspection
Inspection and Quarantine Sampling Standards
About sampling inspection
gas phase sample program
sequence
Code of Counting Sampling Inspection Part 10
Sampling standard
sequential
Sampling Plan
poor sequence
sampling inspection
Sample Locator
gas phase sample
sample + sequence
ph meter program
Sampling inspection standard
Inspection procedure
Type inspection sampling
test result procedure
Counting sampling inspection procedures and tables
Pre-inspection management program
Counting sampling inspection program table
GBT8051
GB/T 308-2002
GB/T 8051-2002
GB/T 8051-2008
Counting Sampling Inspection Procedures Part 6
Periodic inspection counting sampling procedure and table
Sampling procedures and tables for periodic inspection techniques
International Latest Count Sampling
Measurement sampling inspection group

《GB/T 8051-2002计数序贯抽样检验程序及表》由TC21(全国统计方法应用标准化技术委员会)归口,主管部门为国家标准化管理委员会。
本标准规定了离散个体的计数序贯抽样检验方案与程序。本标准主体中的方案由生产方风险点与使用方风险点为索引。作为对于GB/T 2828(ISO 2859-1)抽样方案系统的补充,在附录A中规定了以可接受质量水平(AQL)为索引的记数序贯抽样检验方案与程序。本标准的目的是提供对检验结果的序贯评定程序,使用此程序可通过拒受劣质批给生产方带来的经济和心理上的压力,促使生产方提供具有高概率接受质量的批。同时,给接受劣质批的概率规定一个上限,使得使用方也受到保护。本标准指定的抽样方案,可用于但不限于以下不同的检验场合,例如:――最终产品;――部件和原材料;――操作;――在制品;――库存物资;――维修操作;――数据或记录;――管理程序。本标准的方案抽样方案可用于不合格程度用不合格品率(或不合格品百分数)或每单位产品不合格数(或每百单位产品不合格数)来表示的情况。抽样检验方案基于不合格品为随机发生并统计独立的假设。也许有确实的理由怀疑样品的某个不合格是由于可能同时导致其它不合格的条件引起,如果这样的话,更好的方法是考虑这个样品是合格品还是不合格品,而忽略多重不合格的情况。附录A中的方案主要适用于检验同一条生产线上的连续系列批,本标准主体中的方案也可以用来检验孤立批。


Scope

This standard specifies the counting sequential sampling inspection scheme and procedure for discrete individuals. The schemes in the main body of this standard are indexed by producer risk points and user risk points. As a supplement to the sampling plan system of GB/T 2828 (IS0 2859-1), appendix A stipulates the counting sequential sampling inspection plan and procedure indexed by the acceptable quality level (AQL). T The purpose of this standard is to provide a sequential assessment procedure for inspection results, the use of which will induce the manufacturer to provide lots with a high probability of acceptance quality through the economic and psychological pressure on the producer to reject inferior lots. At the same time, an upper limit is set for the probability of receiving inferior batches, so that the user is also protected. The sampling plan specified in this standard can be used but not limited to the following different inspection occasions, for example: - final products; - components and raw materials; - operations; - work in progress; - inventory materials; - maintenance operations; - data or records; - management procedures. The sampling plan of this standard can be used when the degree of nonconformity is expressed by the rate of nonconforming products (or percentage of nonconforming products) or the number of unqualified products per unit (or the number of unqualified products per hundred units). The sampling inspection plan is based on the assumption that nonconforming products occur randomly and are statistically independent. There may be good reason to suspect that a failure of a sample is due to conditions that may have caused other failures at the same time. If so, it is better to consider the sample as a conforming or rejecting product and ignore multiple failures. Condition. The scheme in Appendix A is mainly applicable to the inspection of continuous series of batches on the same production line. The scheme in the main body of this standard can also be used to inspect isolated batches.

Sample only — not a preview of GB/T 8051-2002
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 6378.3-2024 in English

    GB/T 6378.3-2024 in English

    Sampling procedures for inspection by variables—Part 3: Double sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection

    2024-09-29
  • GB/T 40681.2-2023 in English

    GB/T 40681.2-2023 in English

    Statistical methods in monitoring process capability and performance—Part 2: Process capability and performance of time-dependent process models

    2023-11-27
  • GB/T 16307-2026 in English

    GB/T 16307-2026 in English

    Sequential sampling plans for inspection by variables for percent nonconforming (known standard deviation)

    2026-01-28
  • GB/T 3358.1-2009 in English

    GB/T 3358.1-2009 in English

    Statistics—Vocabulary and symbols—Part 1:General statistical terms and terms used in probability

    2009-10-15
  • GB/T 16306-2008 in English

    GB/T 16306-2008 in English

    Re-inspection and re-test procedures for assessment of declared quality levels

    2008-08-06
  • GB/T 4086.7-2025 in English

    GB/T 4086.7-2025 in English

    Data analysis and decision—Tables for statistical distributions—Part 7: Non-central t-distribution

    2025-10-05
  • GB/Z 31233-2014 in English

    GB/Z 31233-2014 in English

    Implementation guide of random sampling for discrete items

    2014-09-30
  • GB/T 6378.1-2008 in English

    GB/T 6378.1-2008 in English

    Sampling procedures for inspection by variables - Part 1: Specification for single sampling plans indexed by acceptance quality limit (AQL) for lot-by-lot inspection for a single qual

    2008-07-28