Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
thermal performance verification tests method c-thermal performance verification tests performance verification tests steam turbines thermal performance acceptance test quilted products above-mentioned appliances structural steels gb/t
GB/T 8117.3-2014 in English

GB/T 8117.3-2014 in English

VALID

Rules for steam turbine thermal acceptance test-Part 3:Method C-Thermal performance verification tests of retrofitted steam turbines

  • Issued on:2014-12-22
  • Implemented on:2015-06-01
  • File Format:PDF
  • Delivery:Via email within 10 business days
Price(USD): $930.00
$903.00
Standard No: GB/T 8117.3-2014
Document status: VALID
Title in English: Rules for steam turbine thermal acceptance test-Part 3:Method C-Thermal performance verification tests of retrofitted steam turbines
Title in Chinese: 汽轮机热力性能验收试验规程 第3部分:方法C改造汽轮机的热力性能验证试验
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 10 business days
Issued on: 2014-12-22
Implemented on: 2015-06-01
ICS Classification: 27.040-Gas and steam turbines, Steam engines
Professional Classification: GB-National Standard
Related Keywords: thermal performance verification tests
method c-thermal performance verification tests
performance verification tests
steam turbines
thermal performance acceptance test
Related Topics: steam turbine
Proficiency testing group
performance acceptance
Test Proficiency Verification
Proficiency testing group
heat
Proficiency testing group
thermal performance
thermal performance
rank proficiency test
Inspection and test ability
performance verification
Proficiency testing method validation
performance verification
external proficiency testing
Organic Proficiency Testing
Inspection test ability:
Test capacity building
Thermodynamic test
performance acceptance
Proficiency Testing Analysis Method
Test verification ability
Inspection ability
Test verification ability
Inspection ability
GB/T 8117.3
GB/T 8117.3-2014
Failed to pass proficiency verification assessment, try analysis
Summary of proficiency testing test work
Thermal performance test of gas expansion machine
Standard test verification capabilities
Gas turbine thermal test standards
Thermal test
Thermodynamic simulation testing machine
Flywheel performance test
Plastic Density Capability Verification Analysis Method
Engine performance acceptance
Proficiency testing instead of method verification
Steam turbine quality acceptance test
Steam Turbine Thermal Test Procedure Standard Network

《GB/T 8117.3-2014汽轮机热力性能验收试验规程 第3部分:方法C 改造汽轮机的热力性能验证试验》由TC172(全国汽轮机标准化技术委员会)归口,主管部门为中国电器工业协会。
GB/T 8117的本部分,也称为改造规程,制定了用于改造汽轮机的热力性能验证试验的补充性改造规程。
  
  本部分所给出的规定遵循GB/T 8117.2-2008中的导则,但还修改和补充了改造汽轮机的保证值以及通过热力性能验收试验来验证保证值。
  
  本部分给出了验证试验的准备、实施、计算、试验结果与保证值的比较及测量不确定度等一般原则。
  
  本部分仅适用于汽轮机设备中某些硬件改造的性能验证试验。本部分不适用于循环系统的任何改进或其他电站设备的任何改造(例如锅炉、给水加热器等)。


Scope

This part of GB/T 8117, also known as "Retrofit Regulations", sets out supplementary modification procedures for thermal performance verification tests for retrofitting steam turbines. The provisions given in this section follow the guidelines in GB/T 8117.2-2008, but also modify and supplement the guaranteed value of the modified steam turbine and verify the guaranteed value through the thermal performance acceptance test. This section gives the general principles of preparation, implementation, calculation, comparison of test results and guaranteed values, and measurement uncertainty of verification tests. This section is only applicable to performance verification tests of certain hardware modifications in steam turbine equipment. This section does not apply to any improvement of the circulation system or any modification of other power plant equipment (such as boilers, feed water heaters, etc.).

Sample only — not a preview of GB/T 8117.3-2014
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 8117.4-2017 in English

    GB/T 8117.4-2017 in English

    Rules for steam turbine thermal acceptance test-Part 4:Method D-Simplified performance test rules for steam turbine and its thermal cycle

    2017-11-01