GH/T 1264-2019 in English
VALIDCotton feeder
- Issued on:2019-07-08
- Implemented on:2019-12-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$146.00
| Standard No: | GH/T 1264-2019 |
| Document status: | VALID |
| Title in English: | Cotton feeder |
| Title in Chinese: | 籽棉喂花机 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2019-07-08 |
| Implemented on: | 2019-12-01 |
| ICS Classification: | 65.040.20-Buildings and installations for processing and storage of agricultural produce |
| Chinese Classification: | B93-Agricultural products and feed processing machinery |
| Related Topics: | cotton
hello cotton noodles cotton strength GH 2 Seed cotton gh/t Hello% cotton swab box Hello Feed cotton gh/t1247-2019 Wire feeder Wire feeder execution Cotton stacking gh/t1243-2019 gh/t 1161 |
本标准规定了籽棉喂花机的型号、技术要求、试验方法、检验规则及标志、包装、贮存和运输要求。
本标准适用于籽棉喂花机的设计、制造及质量检测。
Introduction
Analysis of standard technical framework
| Core indicators | GH/T 1264 requirements | Industry benchmarks | Test methods |
|---|---|---|---|
| Operating temperature range | -20℃~40℃ | Conventional equipment -15℃~35℃ | Environmental simulation test |
| Power consumption per ton | ≤4kW·h/t | Industry average 5kW·h/t | Actual measurement by electric meter |
| Dynamic balance of spike roller | G16 grade | General G20 grade | GB/T 9239.1 |
Technical requirements for key components
Piercing roller As a core component, the standard clearly requires: radial circular runout ≤2.5mm, end face runout ≤1.0mm, and the arrangement of piercing nails must meet the accuracy requirements of spacing error ±1mm. In actual application, a cotton enterprise in Xinjiang uses laser calibration technology to control the runout within 1.8mm, and the equipment life is increased by 30%.
Safety and energy efficiency innovation
Clause 4.4 of the standard quotes GB 18399 safety regulations, requiring the protective cover of exposed running parts to have a gap ≤5mm. A manufacturer in Shandong Province has integrated an infrared emergency stop device to achieve automatic shutdown when the flower feeding speed exceeds the rated value by 15%.
Implementation suggestions
1. The selection of the hydraulic system should give priority to the double-acting single-piston rod hydraulic cylinder that complies with the JB/T 5123 standard, and the working pressure is recommended to be maintained in the 8-12MPa range
2. The chain drive components need to be regularly tested for the pitch wear specified in GB/T 8350, and should be replaced in time if it exceeds 3%
3. Improved models (such as 6MWDZ-20A) need to be re-type inspected, with special attention to the slat sealing test in clause 4.2.7

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GH/T 1337-2021 in English
Rapid determination of impurity content of seed cotton. Near infrared spectroscopy
2021-07-07 -

GH/T 1098-2014 in English
Seedcotton stack temperature and humidity monitoring instrument
2014-10-21 -

GH/T 1085-2012 in English
Technical specification for cotton bale storage yard of cotton processing enterprise
2012-12-10 -

GH/T 1304-2020 in English
Microwave measuring instrument for seed cotton moisture regain
2020-12-07 -

GH/T 1373-2022 in English
Processing technical requirements for carding cotton wadding
2022-06-13 -

GH/T 1265-2019 in English
Graduation instrument for cotton preparation
2019-07-08 -

GH/T 1320-2020 in English
Technical specifications for distributed optical fiber temperature monitoring systerm of cotton warehouse
2020-12-07 -

GH/T 1188-2021 in English
Gear milling machine
2021-07-07