Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
submarine scopethis specification submarine pre-action systems submarine pre-action sprinkler fire preaction system specification similar cable reel products international high temperature test standards high temperature material performance evaluation water turbine generators
GJB 8656-2015 in English

GJB 8656-2015 in English

VALID

Specification for preaction system of submarine

  • Issued on:2015-12-19
  • Implemented on:2016-03-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $230.00
$224.00
Standard No: GJB 8656-2015
Document status: VALID
Title in English: Specification for preaction system of submarine
Title in Chinese: 潜艇用预作用喷水灭火系统规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2015-12-19
Implemented on: 2016-03-01
Professional Classification: GJB-Military
Related Keywords: submarine scopethis specification
submarine pre-action systems
submarine pre-action sprinkler fire
preaction system
specification
Related Topics: submarine
quenching effect
spray water
sprinkler test
role in english
Quenching
Quenching
self-quenching
gjb 2015
Electrical system function
fire extinguishing system
fire extinguishing system
water system function
system effect
Preaction device
usv submarine
submarine self-defense system


Scope

This specification specifies the requirements, quality assurance regulations, delivery preparation, etc. of submarine pre-action sprinkler fire extinguishing systems (hereinafter referred to as pre-action systems). This specification is applicable to the design and acceptance of submarine pre-action systems.

Sample only — not a preview of GJB 8656-2015
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend