Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
quality inspection standards test items method standard sampling ratio coating thickness gb/t anticorrosive coating aluminum coating 40-80μm paint coating steel tower perfluorooctanoicacid hplc-ms/ms method probe microscope civil transport airport service quality
GY 64-2010 in English

GY 64-2010 in English

SUPERSEDED

Anticorrosive coating of steel tower and mast for radio and television

  • Issued on:2010-08-04
  • Implemented on:2010-08-04
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $210.00
$204.00
Standard No: GY 64-2010
Document status: SUPERSEDED
Superseded by: GY/T 64-2021 Anticorrosive coating of steel tower and mast for radio and television
Title in English: Anticorrosive coating of steel tower and mast for radio and television
Title in Chinese: 广播电视钢塔桅防腐蚀保护涂装
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2010-08-04
Implemented on: 2010-08-04
Professional Classification: GY-Radio, Film and TV
Related Keywords: quality inspection standards test items method standard sampling ratio coating thickness gb/t
anticorrosive coating
aluminum coating
40-80μm paint coating
steel tower
Related Topics: painting
anti-corrosion
tower
broadcasting standard
Broadcasting
Broadcasting
Anti-corrosion protective coating for transmission line iron tower
Anti-corrosion coating technology
Copper Corrosion Protection
Electric power tower anti-corrosion acceptance
Electric power tower anti-corrosion
State Administration of Radio, Film and Television

本标准规定了广播电视钢塔桅防腐蚀保护涂装的技术要求、检验要求、试验方法和包装、运输、贮存要求。
本标准适用于广播电视钢塔桅的防腐蚀保护涂装,包括混土广播电视塔的钢桅杆。
本标准适用于以下涂装工艺:热喷涂锌及锌合金涂层;热喷涂铝及铝合金涂层;热浸镀锌层;涂料涂层;封闭涂料层。


Introduction

Background of Standard Revision and Technological Evolution

The main technical upgrades of the GY 64-2010 standard replacing the 1989 version are: refined surface treatment process, systematization of coating technical parameters, and standardization of inspection methods. The new standard adds 3 normative appendices and deletes the outdated classification of coating thickness use conditions, which is more in line with the requirements of modern anti-corrosion engineering technology.


Comparison of key process technology requirements

Process type Core parameters 1989 version requirements 2010 version requirements
Thermal spraying zinc aluminum Minimum thickness Unspecified ≥120μm
Hot dip galvanizing Adhesion amount Graded by component thickness 610g/m² when t≥5mm
Paint sealing Construction interval Not specified Within 4 hours after sandblasting

Surface treatment technical specifications

The standard clearly stipulates two treatment methods: Sandblasting rust removal (Sa2½ grade) and Acid pickling rust removal (Be grade). Roughness requirements after sandblasting:

  • Thermal spraying process: 40-80μm
  • Paint coating: <50μm

Actual application case:After sandblasting rust removal on a 328m TV tower, the measured surface roughness was 62μm, which fully met the requirements of thermal spraying aluminum coating.


Key points for coating implementation

1. Thermal spraying zinc-aluminum process

Zn99.99 or Al99.5 grade materials must be used, the ambient temperature must be 3°C higher than the dew point, and the sealing process must be completed within 6 hours after spraying.

2. Hot-dip galvanizing control

It is prohibited to galvanize closed inner cavity components, and the plating leakage area exceeds 0.5% and needs to be re-plated. The thickness of the repair layer should be more than 30μm thicker than the standard value.

3. Coating matching scheme

The standard appendix provides 7 matching schemes, such as: a three-layer system of epoxy iron red primer + epoxy micaceous iron intermediate paint + polyurethane topcoat.


Quality Inspection Standards

Test Items Method Standard Sampling Ratio
Coating Thickness GB/T 4956 Magnetic Method 10% Components
Bonding Strength Appendix A Pull-Apart Method 1% Components
Galvanizing Uniformity Appendix B Copper Sulfate Method 4 Times Without Exposing Iron

Project Implementation Suggestions

  1. Material control: Zinc ingots must meet the Zn99.95 requirements of GB/T 470, and aluminum alloys are preferably Al-Mg5 series
  2. Process monitoring: Establish a closed-loop quality control process of sandblasting/pickling → painting → inspection
  3. Safety protection: The painting site must be equipped with explosion-proof ventilation equipment, and operators must wear professional protective equipment
  4. Acceptance focus: Focus on the coating integrity of easily corroded areas such as edges, welds, etc.