HB 7766-2005 in English
VALIDInstallation general requirements of gas Turbine turnkey installation
- Issued on:2005-12-26
- Implemented on:2006-05-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$146.00
Scope
This standard specifies the installation requirements for gas turbines and complete sets of equipment (hereinafter referred to as complete sets of equipment). This standard applies to the installation of complete sets of gas turbine equipment for power generation. Complete sets of gas turbine equipment for ships and mechanical drives can be implemented as a reference.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

HB 6775-1993 in English
General Specification for Rate Gyroscope Components for Airborne Fire Control System Use
1994-06-01 -

HB 7066-2022 in English
Test method of toxicity gas produced by burning cabin nonmetallicmaterials installed in the fuselage for civil aircraft
- -

HB 6167.14-2014 in English
Environmental conditions and test procedures for airborne equipment of civil airplane-Part 14:Fire flammability test
2014-05-06 -

HB 7399-2022 in English
Heat release rate test method for cabin nonmetallic material installedin the fuselage for civil aircraft
- -

HB 7263-2022 in English
Oil burner test for seat cushions of civil aircr aft
2022-04-24 -

HB 4-1983-1983 in English
Demultiplex Joint
1984-08-23 -

HB 3-56-2008 in English
Specification of spring, column, spirality, twist, compress/stretch, made of carbon/alloy steel wire
2008-03-17 -

HB 7619-1998 in English
General Specifications for Airborne Bomb Shackle
1999-01-06 -

HB 5936-2011 in English
Marking of Parts and assemble
2011-07-19 -

HB 5425-1989 in English
Testing Method for Work Zone of Heat Treatment Furnace of Aviation Workpiece
1989-05-13