Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
aircraft assembling technology conduct installation scopethis part aircraft duct installation installation aircraft process methods main hoisting system a hoisting system stripper plate scopethis part shale gas project
HB/Z 223.20-2002 in English

HB/Z 223.20-2002 in English

VALID

Aircraft Assembling Technology Conduct Installation

  • Issued on:2002-11-20
  • Implemented on:2003-02-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $330.00
$321.00
Standard No: HB/Z 223.20-2002
Document status: VALID
Title in English: Aircraft Assembling Technology Conduct Installation
Title in Chinese: 飞机装配工艺 导管安装
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2002-11-20
Implemented on: 2003-02-01
Chinese Classification: V18-Cold processing technology
Professional Classification: HB-Aviation
Related Keywords: aircraft assembling technology conduct installation scopethis part
aircraft duct installation
installation
aircraft
process methods
Related Topics: hb/z
hb z
z - hb
Assembly process
Assembly process
Aircraft assembly
Hot loading process
Process water conductivity
Semiconductor assembly integrated assembly

本部分规定了飞机导管安装的工艺方法、工艺参数、检验方法、所用的材料、工具、设备及质量控制等。
本部分适用于各机型导管的安装。


Scope

This part specifies the process methods, process parameters, inspection methods, materials, tools, equipment and quality control used for aircraft duct installation. This section applies to the installation of ducts of all models.

Sample only — not a preview of HB/Z 223.20-2002
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend