JC/T 545-2020 in English
VALIDThe general principle for energy balance of glass fiber factory
- Issued on:2020-04-16
- Implemented on:2020-10-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$220.00
$214.00
$214.00
| Standard No: | JC/T 545-2020 |
| Document status: | VALID |
| Title in English: | The general principle for energy balance of glass fiber factory |
| Title in Chinese: | 玻璃纤维工厂能量平衡通则 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2020-04-16 |
| Implemented on: | 2020-10-01 |
| Superseding: |
JC/T 545-1994 General rules for energy balance of fiber glass plant
|
| Professional Classification: | JC-Building Material |
| Related Keywords: | energy balance
energy balance implementation four-link energy balance model energy consumption complete energy management system |
| Related Topics: | energy balance
factory Branch energy factory water balance field water balance field Fiber property measurement energy balance JC/T 60006-2020 JC/T60006-2020 Oven air flow balance and air volume balance Water balance field standard Flat glass leaves the factory Glass products factory quality inspection fiberglass factory design jc/t6006-2020 jc t 60006-2020 jc/t2561-2020 energy |
本标准规定了玻璃纤维企业进行能量平衡的术语和定义、能量平衡模型、能量平衡的原则、能量平衡的统计测试与计算、能量平衡的指标、能量平衡报告。
本标准适用于池窑法生产连续玻璃纤维的企业和企业内部独立用能单元。
Introduction
Analysis of the core content of the standard
JC/T 545-2020 standard has established a complete energy management system for glass fiber factories. The main technical breakthroughs are reflected in:
- The four-link energy balance model (purchase storage/processing conversion/transmission distribution/terminal use) is introduced for the first time
- The new statistical-testing dual-track system calculation method is added, and the energy metering equipment is required to comply with GB 17167
- The requirements of the 1994 version of the energy flow diagram are cancelled, and the data empirical analysis
Key comparison between the new and old standards
| Comparison dimensions | 1994 version | 2020 Edition |
|---|---|---|
| Scope of application | General glass fiber production | Limited pool kiln method continuous production |
| Technical method | Single test calculation | Statistical calculation + test verification |
| Indicator system | Including equipment efficiency indicators | Focus on unit energy consumption indicators |
Key points for energy balance implementation
Typical application scenarios
Take an enterprise with an annual output of 100,000 tons of glass fiber yarn as an example:
- The melting process accounts for 58% of the energy consumption, and the kiln temperature curve needs to be monitored.
- The electricity equivalent value conversion coefficient is 0.1229kgce/(kW·h)
- The loss rate of the transmission pipeline network is controlled at ≤1.2%
Energy saving optimization suggestions
- Establish an energy management center system to achieve real-time monitoring
- Promote waste heat recovery technology for raw silk drying
- Regularly conduct leakage plate thermal balance test (refer to GB/T 25039)
Sample only — not a preview of JC/T 545-2020

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

JC 405-1991 in English
Humidification tower for cement industry
1991-02-02 -

JC/T 597-1995 in English
Transparent quartz glass tubes for semiconductors
1995-11-23 -

JC 404-1991 in English
Ventilated separator for cement industry
1991-02-02 -

JC/T 533-1994 in English
Chromium alloy casting grinding balls for building materials industry
1994-02-17