LD/T 72.8-2008 in English
VALIDConstruction Engineering Construction work quota - concrete works
- Issued on:2009-01-08
- Implemented on:2009-03-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$830.00
$806.00
$806.00
| Standard No: | LD/T 72.8-2008 |
| Document status: | VALID |
| Title in English: | Construction Engineering Construction work quota - concrete works |
| Title in Chinese: | 建设工程劳动定额 建筑工程-混凝土工程 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2009-01-08 |
| Implemented on: | 2009-03-01 |
| Professional Classification: | LD-Labor and Safety |
| Related Keywords: | construction engineering construction work quota
concrete work concrete engineering concrete works construction projects |
| Related Topics: | construction work
Build a first-class project Midwest Construction Project construction labor quota Labor Quotas for Construction Works cable for construction Code for design of seismic performance of concrete structures in construction engineering Civil Works Bill of Quantities Communication engineering construction project acceptance |
本标准适用于一般工业与民用建筑的新建、扩建、改建工程中的混凝土工程。
本标准是施工企业编制施工作业计划、签发施工任务书、考核工效、实行按劳分配和经济核算的依据;是规范建筑劳务合同签订和履行,指导施工企业劳务结算与支付管理的;是各地区、各部门编制预算定额、清单计价定额人工消耗量标准的依据;是各地建筑行政主管部门发布实物工程量人工单价的基础。
Introduction
This standard provides detailed guidelines for labor quotas specifically related to concrete work in construction projects. It outlines the required labor inputs, work procedures, and time estimates necessary for various tasks involved in concrete engineering. The content covers different aspects of concrete operations, including preparation, mixing, pouring, and finishing, ensuring consistency and efficiency in labor utilization. It serves as a reference for project planning, resource allocation, and performance evaluation within the construction industry. The standard is structured to facilitate accurate estimation and management of labor resources throughout the construction process. It includes specific data on labor requirements for different types of concrete works, helping professionals make informed decisions regarding workforce planning and project scheduling. This information supports the optimization of labor usage and contributes to the overall effectiveness of construction activities.
*** Please note: This description may not be accurate, please refer to the official documentation.
Sample only — not a preview of LD/T 72.8-2008

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

LD 55-1994 in English
Key Points of Quality Assurance Control for Dissolved Acetylene Cylinders
1994-05-17 -

LD/T 107-1998 in English
Worker injuries and occupational degree of disability identified by code
1998-03-21 -

LD/T 1-1992 in English
Highway maintenance quota standards
1992-04-03 -

LD 7-1991 in English
Open combined powered dust respirator
1991-08-06 -

LD 68-1994 in English
Code for Monitoring Safety Technology of Lifting Winch for Coal Mine
1994-11-10