LD/T 74.2-2008 in English
VALIDConstruction of labor quota installation works - Electrical installation work
- Issued on:2009-01-08
- Implemented on:2009-03-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$2,050.00
$1,989.00
$1,989.00
Introduction
This standard provides detailed guidelines for the labor quotas specifically related to electrical installation works within the broader scope of construction projects. It outlines the necessary procedures, requirements, and benchmarks for labor activities involved in the installation of electrical systems. The content covers various aspects such as work processes, safety measures, and efficiency standards to ensure the proper execution of electrical installation tasks. It serves as a reference for professionals involved in planning, managing, and executing electrical installation projects. The standard is structured to facilitate its application in different contexts and environments where electrical installations are required. It includes definitions, technical specifications, and practical recommendations to support consistent and reliable performance in the field. This document is intended to be used by relevant stakeholders to enhance the quality and safety of electrical installation works in the construction industry.
*** Please note: This description may not be accurate, please refer to the official documentation.
Sample only — not a preview of LD/T 74.2-2008

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

LD 55-1994 in English
Key Points of Quality Assurance Control for Dissolved Acetylene Cylinders
1994-05-17 -

LD 0091-1996 in English
Honeycomb coal material labor quota
1996-02-07 -

LD/T 121-2003 in English
Directive for comprehensive evaluation of occupational health technical measures
2003-06-09 -

LD/T 72.11-2008 in English
Construction Engineering construction work quota - corrosion, insulation, insulation works
2009-01-08