Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
apron area anti-corrosion treatmenthot-dip galvanizing/hot aluminum sprayingcancel apron introduction background lifting system parametersrequirements wire ropegb single rope system system check disclosure process valve-potential pressure life test regulation scopethis standard soil carbon stock survey
MH/T 6013-2018 in English

MH/T 6013-2018 in English

VALID

Raising and lowering lighting columns for apron

  • Issued on:2018-08-21
  • Implemented on:2018-11-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00
Standard No: MH/T 6013-2018
Document status: VALID
Title in English: Raising and lowering lighting columns for apron
Title in Chinese: 机坪升降式高杆灯
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2018-08-21
Implemented on: 2018-11-01
Superseding: MH/T 6013-1999 Raising and lowering lighting columns for airports
Professional Classification: MH-Civil Aviation
Related Keywords: apron area anti-corrosion treatmenthot-dip galvanizing/hot aluminum sprayingcancel
apron introduction background
lifting system parametersrequirements wire ropegb
single rope system
system check
Related Topics: Gao Shengzhuan
mh/t 4049-2018
light pole
Increased VQ ratio


Introduction

Background of Standard Revision and Technological Evolution

MH/T 6013-2018 replaces the 1999 version of the standard. The main technical changes include:

Technical DimensionsRequirements of the 1999 versionUpdates to the 2018 version
Scope of ApplicationAirport Lifting High Pole LightsLimited to the apron area
Anti-corrosion TreatmentHot-dip galvanizing/hot aluminum sprayingCancel hot aluminum spraying, galvanizing layer thickness classification requirements
Lifting systemSingle drum typeNew double/triple drum type configuration
Safety factorUniform safety factor 8Differentiate between single rope (8) and multi-rope (6) safety factors

Analysis of core technical requirements

4.6.1 Structural design

Light poles shall be designed in accordance with GB 50009 wind load and GB 50011 earthquake resistance codes. Basic wind pressure adjustment coefficient requirements:

  • Coastal area ×1.2
  • Mountainous area ×1.5
  • Pole top displacement ≤0.3% pole height

4.6.3

Polygonal light poleThe plug-in point must meet the following requirements:

  • Inner weld reinforcement ≥1.5 times the pipe diameter
  • Bite edge depth ≤0.5mm
  • Full penetration weld inspection pass rate>95%

Technical requirements for key equipment

4.6.7 Lifting system

ParametersRequirements
Wire ropeGB 8918 important purpose wire rope, safety factor single rope 8/multi-rope 6
Lifting speedElectric ≤5m/min, manual operating force ≤150N
Anti-fall deviceMust be configured for single rope system, falling distance ≤3m
Worm gear accuracyConform to GB/T 100897 level accuracy

Implementation suggestions

Main points for procurement and acceptance

  1. Check the thickness of hot-dip galvanized layer: ≥55μm for steel plate <3mm
  2. Verify the sensitivity of over-torque protection device of lifting system
  3. Check whether the anti-collision device of lamp panel adopts rubber roller

Maintenance precautions

  • Check the wear of the wire rope every quarter
  • Check the ground resistance <10Ω every year
  • Replace the lubricating oil of the worm gear box every 3 years