Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
guide rail transfer machines rail guide hoists defines rail lift rail bearing deformation rail changing devices hydrogenation catalysts hook-lift self-loading devices exhaust gas treatment efficiency
MZ/T 182-2021 in English

MZ/T 182-2021 in English

VALID

Rail guide hoists for the transfer of disabled persons

  • Issued on:2021-12-10
  • Implemented on:2022-01-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $270.00
$262.00
Standard No: MZ/T 182-2021
Document status: VALID
Title in English: Rail guide hoists for the transfer of disabled persons
Title in Chinese: 功能障碍者导轨移位机
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2021-12-10
Implemented on: 2022-01-01
Professional Classification: MZ-Civil Affairs
Related Keywords: guide rail transfer machines
rail guide hoists
defines rail lift
rail bearing deformation
rail changing devices
Related Topics: five scholars
rail
Requirements and test methods for lifts for the disabled
mz
disfunction
disfunction
guide
shift
multiple obstacles
postoperative cognitive impairment
shift point
six scholars
lift
pool barrier
functional epitope
scholar's rank
ssri sexual dysfunction
Lift configuration services for people with disabilities
mz/t168-2021
Lift industry
t/cams 182
t/cams 182-2021


Introduction

Interpretation of the core content of the standard

Definition of terms

The standard clearly defines rail lift as "a suspended device that is supported by tracks, moves along tracks, and is used to lift and transfer people with disabilities", and specifically distinguishes key components such as the central suspension point (CSP) and flexible device.


Comparative Analysis of Technical Specifications

Dimensions Fixed Mobile Manual Electric
Load Capacity ≥135kg/person (calculated in multiples if multiple people use it)
Horizontal Speed ≤0.3m/s Manual Control Electric Speed Limit
Safety Device Lock Gate + Anti-Fall Mechanical brake Emergency stop + double limit

Key technical requirements

Safety performance

  • Lifting braking distance ≤50mm (electric type)
  • Flexible device needs to withstand 7 times the maximum load static test
  • Working noise <60dB(A)

Implementation recommendations

Application Guide for Medical Institutions

It is recommended to give priority to electric guide rail transfer machines with IPX4 waterproof grade, and conduct regular inspections:

  1. Test the response time of the emergency stop device every month
  2. Measure rail bearing deformation every quarter (≤1mm/200mm)
  3. Perform 11,000 lifting cycles durability verification every year

Background of standard evolution

This standard combines the general requirements of GB/T 20404-2014 "Lifting Machines for People with Disabilities" with the special needs of rail-type equipment for the first time, and adds special test methods such as rail bearing deformation and rail changing devices, reflecting the development trend of my country's rehabilitation assistive device technology from single function to systematic solutions.

Sample only — not a preview of MZ/T 182-2021
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend