Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
shale gas core logging technology specification part shale gas pressure-maintaining coring shale gas deep shale gas exploration core acquisition operations introduction technical background chinese speech recognition technologies artificial stone products scopethis standard anti-caries efficacy evaluation
NB/T 11621.1-2024 in English

NB/T 11621.1-2024 in English

VALID

Shale Gas Core Logging Technology Specification Part 1: Core Acquisition Operations

  • Issued on:2024-09-24
  • Implemented on:2025-03-24
  • File Format:PDF
  • Delivery:Via email within 2~4 business days
Price(USD): $339.00
$329.00
Standard No: NB/T 11621.1-2024
Document status: VALID
Title in English: Shale Gas Core Logging Technology Specification Part 1: Core Acquisition Operations
Title in Chinese: 页岩气 保压取心技术规范 第1部分:取心作业
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 2~4 business days
Issued on: 2024-09-24
Implemented on: 2025-03-24
Chinese Classification: E13-Petroleum drilling
Professional Classification: NB-Energy
Related Keywords: shale gas core logging technology specification part
shale gas pressure-maintaining coring
shale gas
deep shale gas exploration
core acquisition operations introduction technical background


Introduction

Technical background and innovative value of the standard

As my country's first special standard for shale gas pressure-maintaining coring, NB/T 11621.1-2024 fills the gap in technical standards for deep shale gas exploration. Compared with conventional coring standards such as SY/T 5347-2016, its core innovations are reflected in:

Comparison dimensions Traditional coring standards Pressure-maintaining coring standards
Pressure maintenance No clear requirements Requires 15MPa stable pressure for 10min and pressure drop ≤0.5MPa
Seal detection Visual inspection Soap water detection + pressure decay double verification
Tool configuration Basic coring tools Mandatory equipment class=instrument>Differential assembly and Pressure-maintaining inner tube sealing valve

Analysis of key operation technical requirements

1. Tool sealing verification

Article 5.3.4 of the standard clearly requires a step-by-step pressure test: 1MPa initial inspection + 15MPa final inspection. Compared with the API standard, an intermediate pressure transition link is added to detect seal assembly defects in advance.

2. Wellbore adaptability design

Differentiated drilling tool combination solutions are given for different well types, and it is particularly stipulated that high-angle wells need to use ≤9m short tools, and horizontal wells need to adjust the position of the weighted drill pipe to solve the passability problem of conventional coring tools in complex wellbores.


Gas content test operation specifications

Typical case: During pressure-maintaining coring at the 2300m well section of a shale gas well, the pressure-maintaining inner tube was tilted 50cm according to the requirements of Article 7.2.3 and then tested. The measured gas content was 18% higher than that of the conventional method, confirming that the free gas content in the reservoir was underestimated.

Dual indicators for sealing verification

  • Visual inspection: no bubbles in soapy water for 5 minutes
  • Pressure decay: pressure drop <5% in 15-20 minutes

Implement risk control on site

According to Article 6.4 of the standard, a three-level termination mechanism needs to be established:

Primary risk Core blockage/core grinding Immediately stop operation
Secondary risk Abnormal fluctuation of pump pressure Check the status of the sealing valve

Suggestions on the direction of standard evolution

The next step needs to be supplemented: ①Correction coefficient of coring parameters for ultra-deep layers (>3500m) ②Special treatment process for CO2-bearing strata ③Digital core tracing system interface specifications.

Sample only — not a preview of NB/T 11621.1-2024
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • NB/T 11622-2024 in English

    NB/T 11622-2024 in English

    Shale Gas Deep High-Temperature High-Pressure Horizontal Well Density Reduction and Temperature Control Drilling Operations Specification

    2024-09-24