NB/T 14009-2016 in English
VALIDThe recommended method of drilling fluids for shale gas- Oil-based fluids
- Issued on:2016-12-05
- Implemented on:2017-05-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$117.00
Introduction
*** Please note: This description may not be accurate, please refer to the official documentation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

NB/T 47062-2017 in English
Biomass molded fuel fired boilers
2017-12-27 -

NB/T 14006-2020 in English
Specification for design of shale gas gathering and transportation system
2020-10-23 -

NB/T 10641-2021 in English
Testing equipment on-site for off-board charger of electric vehicle
2021-04-26 -

NB/SH/T 0983-2019 in English
Standard test method for low temperature viscosity of drive line lubricants in a constant shear stress viscometer
2019-06-04 -

NB/T 11235-2023 in English
Clean warm air biofuel fireplace
2023-05-26 -

NB/T 10872-2021 in English
Code for Design of Roller-Compacted Embankment Dams
2021-12-22 -

NB/T 10163-2019 in English
Reciprocating piston pump for mine
2019-06-04 -

NB/T 11170-2023 in English
Code for Preparation of River Hydropower Planning
2023-05-26 -

NB/T 42117-2017 in English
Technical specification for the biomass boilers using water cooled vibrating grate
2017-08-02 -

NB/T 1001-2011 in English
Technical Specification for Vehicle Filling Station of Liquefied Natural Gas (LNG)
2011-07-28